Construction
Building contractors in London for construction and building works
Groundworks, structure, envelope and general building, run as a main contract with a construction phase plan, a named site manager and a fixed price against a written specification.
- Fixed-price contract
- Principal contractor, CDM 2015
- In-house crew
- Design and build
Updated September 2026
Building contractors in London take on construction and building works that fall outside a single trade: groundworks, drainage, structural alterations, outbuildings and garden rooms, rendering and external envelope repair, and general building. MO Team runs these as principal contractor under CDM 2015, with its own crew, one fixed price and a written handover pack.
What we take on as main contractor
Not every job is a named product. A great deal of construction work in London is a mixed scope: a garden room with power and drainage at the bottom of a terrace garden; a driveway, retaining wall and new drainage run; failed render taken off a rear elevation and replaced; a small new-build infill on a tight plot. What these share is that no single trade owns them and they all need somebody to hold the programme, the safety file and the building control relationship.
We run them the same way each time. A site visit and survey, then drawings and any structural design, then a specification priced line by line, then construction with one site manager and a weekly report. Where a project involves more than one contractor, we act as principal contractor and write the construction phase plan before anyone starts. The London specifics are mostly about access and neighbours: skip permits and suspended bays are issued by the borough, low traffic neighbourhood restrictions shape delivery routes and times, scaffold on a public footway needs a licence, and noisy works are limited to the hours each borough sets. New structures also play by different planning rules from work on the house. A detached outbuilding has its own permitted development limits on height, position and use, and those are removed in conservation areas and by Article 4 directions.
Using one crew matters most on a mixed scope, because that is where jobs usually fail. The groundworker, the bricklayer, the carpenter and the renderer are on the same programme and answer to the same manager, so the sequence holds and the responsibility does not move around when something is found. If we cannot do part of the work well, we say so before pricing rather than subcontracting it quietly. It also means one insurance position and one construction phase plan covering the whole site, rather than a set of separate trades each covering only their own part of it.
What a building works contract includes
Scope varies by project. These are the elements a general building contract with us usually contains.
What is in the price
How it runs
- 01
Site visit and feasibility
We walk the site, take levels where they matter, look at ground and drainage, and confirm the planning position. Where a project is not right for us, we say so at this point rather than pricing it.
- You receive
- A feasibility note and a budget range
- 02
Design, engineering and approvals
Drawings and structural calculations, then the planning and building control applications. Where you already have an architect, we price and build to their drawings instead.
- You receive
- Drawings, calculations and submitted applications
- 03
Specification and fixed price
A written specification naming materials and standards, priced line by line, with exclusions and provisional sums stated. Nothing is ordered and no date committed until you accept it.
- You receive
- A fixed-price contract and a programme
- 04
Mobilisation and construction
Construction phase plan issued, welfare and protection set up, permits and licences in place, then the work in the agreed sequence with a weekly report and photographs.
- You receive
- Weekly reports, inspection records and priced variations before they are built
- 05
Completion and handover
Testing and commissioning, building control sign-off, a joint snagging walk, and the paperwork assembled as one pack rather than chased afterwards.
- You receive
- Completion certificate, test certificates, warranties and as-built information
How long building works take
On-site duration once approvals are in place. Ground conditions and access are the two factors that move these figures most.
How the work is controlled
Common questions
Straight answers.
Not answered here?
Tell us what you are planning. We read every enquiry ourselves and reply within one working day.
Ask us directlyHave a project that does not fit a category?
Describe the site and what you want built. We will tell you whether it suits us and what it is likely to involve.