

Commercial sectors · London · Rollouts nationwide
Fit-out contractors and shopfitters in London
Retail, hospitality, workplace and healthcare fit-out across London, by one in-house crew. We work to your programme, often overnight inside trading centres, and where there is an approved brand package we build to it exactly, the same result on every site.
- Access
- After the centre closes
- Specification
- The brand's approved package
- Handover
- Screened and clean by opening
Herono, Brick Lane. Our photograph, our fit-out.
Sectors
10 units
Behind the hoarding.
Each board is a sector we fit out in London. Where we have photographed our own work in that sector there is a window cut into the board; point at it to see the whole job. Where we have not, the board is blank, because we would rather show you nothing than somebody else’s photograph.

Every unit on this page starts behind one of these.
HEYTEA, Parker Street. Our hoarding, our crew, mid-programme.
- Unit 01Works in progress
Retail fit-out
Shopfronts, interiors and brand rollout for retail units.
For retail operators and brand owners
Read about this sector
- Unit 02Works in progress
Restaurant fit-out
Front and back of house, extract, and compliance for restaurants.
For restaurant groups and independent operators
Read about this sector
- Unit 03Works in progress
Café fit-out
Counters, servery and seating for coffee shops and cafés.
For café operators and coffee chains
Read about this sector
- Unit 04Works in progress
Bar and hospitality fit-out
Bars, servery and licensed hospitality interiors.
For bar and hospitality operators
Read about this sector
- Unit 05Works in progress
Office fit-out
Cat A and Cat B workplace fit-out and reinstatement.
For occupiers, landlords and workplace consultants
Read about this sector
- Unit 06Works in progress
Healthcare and clinic fit-out
Clinical rooms, treatment spaces and compliant finishes.
For clinic operators and healthcare providers
Read about this sector
- Unit 07Works in progress
Dental practice fit-out
Surgeries, decontamination rooms and reception areas.
For dental practice owners
Read about this sector
- Unit 08Works in progress
Beauty and salon fit-out
Salons, treatment rooms and retail display.
For salon and clinic owners
Read about this sector
- Unit 09Works in progress
Gym and studio fit-out
Training floors, studios and changing facilities.
For gym and studio operators
Read about this sector
- Unit 10Works in progress
Landlord and Cat A works
Shell and core completion, Cat A fit-out and reinstatement.
For landlords and managing agents
Read about this sector
Brand rollout
One approved package. Three cities. The same ceiling.
Pop Mart’s cloud ceiling, built by our crew in Manchester, at the Trafford Centre and in Oxford. Where a brand has an approved design package we build to it exactly, with the specified materials, fixtures and finishes rather than a substitute, so the third store looks like the first. The same discipline is what makes a London unit match the rest of the estate.
Our own photographs, on our own jobs.All projects
The night shift
Hoarding up after close. Doors open by morning.
Inside a trading centre the unit can only be worked on after the doors shut, so the crew arrives in the evening, works the access window and leaves the site screened and clean before the shutters go up. Deliveries, waste and noisy work follow the centre’s rules and the agreed permit times.
01Hoarding up
The unit is screened before the centre closes.
02Strip-out
The previous fit-out comes out and goes off site the same night.
03Ceilings and first fix
Services, ceilings and feature elements go in from the top down.
04Signage
Fascia and lettering are fitted once the shell is finished.
05Clean down
Floors washed, protection off, the walkway swept before the doors open.
06Doors open
The centre trades in the morning as if nothing happened.

Working around a trading business
The shop stays open. The restaurant keeps serving. The work still gets done.
Most of our commercial fit-out in London happens while the business around it is still trading. In a shopping centre that means the unit is worked on after the centre closes and handed back screened, swept and safe before it opens. In a restaurant or a shop on a high street it means phasing the work so the front of house trades while the back is rebuilt, or the ground floor serves while the first floor is stripped. Either way the sequence is agreed in writing before anyone arrives, with the hours, the deliveries and the noisy work fixed against the centre’s or the landlord’s rules.
The crew is our own, so the night shift is the same people as the day shift, and the site manager who walked the unit with you is the one on the floor when the shutters come down. We are the principal contractor under CDM 2015 on every job with more than one contractor on it: a construction phase plan before the start, method statements and risk assessments for the permit, inductions for everyone on site, and the health and safety file handed over at the end with the certificates.
We deal with the landlord too. The drawings, the method statements and the insurances the licence to alter needs are prepared by us and chased by us; your solicitor handles the legal document. Starting that early matters, because on a commercial fit-out it is approval times rather than build times that move an opening date. Every sector we work in is set out on the boards above, and each one has its own page with the scope, the programme and the compliance that applies to it. For the service itself, see commercial fit-out.
Four terms every lease conversation turns on
- Shell and core
- The developer's handover: structure, envelope, common parts and capped-off services. Everything inside the demise is still to do.
- Cat A
- The landlord's base fit-out. Raised floors, suspended ceilings, basic lighting, mechanical and electrical distribution and finished surfaces, handed over usable but empty.
- Cat B
- The occupier's fit-out on top of Cat A: partitions, meeting rooms, tea points, joinery, branding, furniture and the finishes people actually see.
- Licence to alter
- The landlord's written consent to the works, granted against drawings, method statements and insurances. It usually takes longer than the build, so it starts first.
Commercial work
Fit-outs we have handed over.
Shops, tea houses, a coffee shop and a Mayfair restaurant. Each record carries the scope and the photographs we took on the job, and names the brand only where the brand has agreed to it.


Pop Mart, Trafford Centre
- Type
- Brand rollout



Pop Mart, Manchester city centre
- Type
- Brand rollout

Pop Mart, Oxford
- Type
- Brand rollout
Common questions
What people ask about fit-out.
Not answered here?
Tell us what you are planning. We read every enquiry ourselves and reply within one working day.
Ask us directly07424 445105Shopfitters take a retail unit from an empty shell, or from a previous tenant's fit-out, to a shop that can trade: the shopfront and glazing, the internal partitions and ceilings, the electrics and lighting, the joinery, counters and display, the flooring, the decoration and the signage. A good shopfitter also runs the programme around the centre's rules and the landlord's approvals, because in a trading centre those decide the opening date more than the build does.
Shopfitting is the retail end of it: shopfront, glazing, joinery, display, tills and lighting in a unit that has to trade the moment it reopens. Commercial fit-out is the wider job across offices, clinics, restaurants and cafés, taking a space from shell or from a previous tenant to something usable. The same crew does both; the sequencing and the approvals differ.
It depends on the state of the unit, the specification and the hours, so we do not publish a rate per square metre. What we do is price against a written specification and a survey of the unit, as a fixed sum rather than an estimate, with the out-of-hours working, the centre's permits and the landlord's requirements priced in from the start. Send the drawings or the brand package and the unit address and you get a figure you can put in front of a board.
Yes, and inside a trading shopping centre it is usually the only way. The unit is worked on after the centre closes, the hoarding goes back and the area is left clean before the doors open. Deliveries, waste and noisy work follow the centre's rules and the agreed permit times. The crew is our own, so the night shift is the same people.
Cat A is the landlord's base fit-out: raised floors, suspended ceilings, basic lighting, mechanical and electrical services and finished surfaces, handed over as a usable but empty space. Cat B is the occupier's fit-out on top of it: partitions, meeting rooms, tea points, joinery, branding and furniture. We work at either level, or take a space through both under one contract.
Yes. Where a brand has an approved package we build to it exactly, using the specified materials, finishes and fixtures rather than substituting them, so a store in Manchester matches one in London. We have done that on rollouts for Pop Mart, HEYTEA, Vibean and Herono. Where a drawing cannot be built as issued, we raise it before the work starts.
Yes. We prepare the drawings and method statements the landlord or centre management asks for, and we run the approvals, the licence to alter and the permits for access, deliveries and out-of-hours work. Your solicitor still handles the legal document itself. Starting this early matters, because approval times rather than build times are what usually move an opening date.
Planning work of your own?
Tell us what you have in mind and we will give you an honest view on scope, programme and budget.





