Process · Design & build · London

How we work: design, price, build, hand over

Six stages, what you decide at each, and where changing your mind is free rather than expensive.

Three MO Team crew members in hi-vis walking along a street on the way to a site visit
Stage one. On the way to look, and no charge for the visit.

The order of these stages is the whole point. Almost every expensive surprise on a building project comes from doing them out of sequence: pricing before the design is settled, starting before approvals are in, or ordering before survey dimensions are confirmed.

One site manager holds the project from mobilisation to handover, on a house extension and on an overnight shopfit alike. At each stage below we have said what it costs to change your mind. Early on it is free. It does not stay free, and knowing where the line is helps you spend your decisions where they matter.

The six stages

Free at the foot, priced at the top

Where changing your mind is free, and where it stops being.

Each stage says what a change costs at that point. The staff beside them keeps the score as you read: it starts at free, and the line where it stops being free is the line worth knowing before you start.

  1. 01

    Site visit

    First conversation and site visit

    Changing your mindFree. There is no charge for the visit.

    A MO Team site manager in a hi-vis vest pointing out work to a colleague on site

    We come and look. We measure enough to be useful, take photographs, and talk about what you actually want rather than what you think is possible. You get an honest budget bracket at this point, clearly labelled as a range. Changing your mind here costs nothing, and there is no charge for the visit.

  2. 02

    Measured survey

    Survey and drawings

    Changing your mindCheap. The last stage where it is.

    A fitter setting out a floor with a green laser level, the lines crossing the slab

    A measured survey, then layouts, elevations and sections, with someone who will have to build the work involved throughout. Structural calculations are produced where the design needs them. This is the last stage where changing your mind is cheap, so it is the stage worth spending time on.

  3. 03

    Rear extension, London

    Approvals, notices and consents

    Changing your mindCosts time: an approval has to be re-run.

    A brick rear extension with a roof lantern and full-width glazed doors on a London house

    Planning where it applies, building control either way, party wall notices with their one and two-month statutory periods, and on commercial work the landlord approval package and licence to alter. These run in parallel rather than one after another, because they are the most common reason a start date moves.

  4. 04

    Specified finishes

    Specification and fixed price

    Changing your mindPriced before you accept. Nothing is ordered until you do.

    A double vanity with two lit mirrors and a timber worktop in a renovated London bathroom

    A written specification naming every material, fitting and finish, and a fixed price against it. You also get what is explicitly excluded and what is carried as a provisional sum, because that is where disputes come from. Nothing is ordered and no date is committed until you have accepted it.

  5. 05

    On site

    On site

    Changing your mindA variation, priced and agreed before it is built.

    Two MO Team crew members from behind on site, the site manager's vest printed MO TEAM MANAGER

    A named site manager, an agreed programme, and working hours that match the borough's rules on noisy work or the landlord's out-of-hours regime. Protection goes up before anything comes down, and the site is cleaned at the end of every day. Variations are priced and agreed before they are built, never afterwards.

  6. 06

    Handover

    Snagging, handover and warranty

    Changing your mindDone. The workmanship warranty runs from here.

    Inside a finished London rear extension, sunlight through the roof lantern onto a new oak floor

    We walk the job with you and write the snagging list together rather than presenting one. Certificates, warranties and building control sign-off are handed over as a set, not chased afterwards. The workmanship warranty runs from this date and we come back for defects within it.

What you get, and what we ask of you

Both sides of the contract.

What you get

  1. 01

    A measured survey and drawings you own

  2. 02

    A written specification detailed enough to compare against anyone else's

  3. 03

    A fixed price with exclusions and provisional sums stated

  4. 04

    A programme with dates rather than durations

  5. 05

    A named site manager and a weekly update whether or not there is news

  6. 06

    Variations priced before they are built

  7. 07

    A handover pack containing the completion certificate, test certificates, warranties and operating information

What we ask of you

  1. 01

    Access, and somewhere to put things. Power, water and a WC on a domestic job, or tell us early and we will arrange welfare facilities

  2. 02

    Decisions when we ask for them. The programme assumes a response within a few working days on choices like tiles, sanitaryware and paint colours. A week's delay on a decision is usually a week on the end date, because trades are booked in sequence and a missed slot is not held open.

  3. 03

    Valuables and anything irreplaceable moved out or locked away before we start.

  4. 04

    Realism about a building of its age. On London housing stock, Victorian terraces especially, what is behind the plaster is not knowable until it is open. Failed damp courses, undersized joists and cloth-covered wiring are routine rather than exceptional. That is why a contingency is not padding: on a property over eighty years old, budget ten to fifteen per cent on top of the contract sum. Most of the time you will not spend it. The times you do, it is the difference between a discovery and a stopped site.

Common questions

What people ask before they start.

Not answered here?

Tell us what you are planning. We read every enquiry ourselves and reply within one working day.

Ask us directly07424 445105

The build rarely holds things up; the approvals do. Building control can be lodged quickly, but a planning application runs to a statutory determination period, and party wall notices carry one or two months depending on the section. On commercial work, landlord approval and a licence to alter take weeks. We start all of those in parallel at design stage so they run alongside the drawings rather than after them.