Restaurant, café and coffee shop fit-out in London

The back of house decides the opening date. Extraction, drainage, gas and the counter services are designed first, and the room the customer sees is built around them, by one crew that has fitted out tea shops and coffee shops.

  • In-house crew

Updated October 2026

A restaurant or café fit-out in London covers the kitchen or coffee counter and its services, extraction and gas interlock where food is cooked, drainage and grease management, front of house joinery, seating and the shopfront. MO Team fits out restaurants, cafés and coffee shops, as for HEYTEA in Liverpool and Vibean Coffee in Manchester.

Back of house first, front of house second

Hospitality fit-out is unlike other commercial work because the systems that decide whether you can open are the ones nobody photographs. In a restaurant that means extraction, make-up air, the gas interlock, suppression over the cooking line, grease management, floor drainage and cleanable finishes, all installed, commissioned and inspected before a single cover is served. In a café or coffee shop the kitchen is the counter: filtered water and drainage for the espresso machine, power for machines, grinders and under-counter refrigeration, a hand-wash basin where environmental health expects it, a pass at the height baristas actually work at, and enough extraction for whatever is toasted or baked behind it. We fit out both. The HEYTEA tea shop on Parker Street in Liverpool and Vibean Coffee in Manchester were counter-led fit-outs to a brand's design package, and we carried out service works at Sexy Fish in Mayfair.

Our sequence starts with the services capacity, because they dictate the plan. For a restaurant, an extraction duct has to reach a discharge point at a height and position the borough will accept, an external flue almost always needs planning permission and an odour assessment, and the drainage needs a grease interceptor sized to the kitchen and agreed with the water company. For a coffee shop the questions are smaller but just as decisive: whether the incoming water supply and the electrical capacity will run the equipment schedule, where the counter drainage can fall to, and whether hot food is on the menu, which brings extraction and grease into a unit that would otherwise not need them. Once those are settled, the kitchen or counter layout, the pass, the seating and the joinery fall into place and can be templated to the equipment. In a London high street unit that also means a shopfront that satisfies the conservation officer; in a shopping centre it usually means an out-of-hours programme under the landlord's fit-out guide, which we offer where the centre requires it. The fit-out contractors in London page explains the approvals side, and the sectors page compares hospitality with retail and clinics.

One programme owner keeps a hospitality programme honest, because the trades collide constantly: the ductwork runs where the ceiling wants to be, the gas line crosses the drainage, and the counter cannot be templated until the equipment is set out. Our site manager holds all of it and reports weekly against the opening date rather than against a percentage complete. Cafés and restaurants both sit in Class E, so converting a shop rarely needs permission for the use itself, but the extraction, the shopfront and the signage usually need their own consents, and a premises licence for alcohol runs on its own timetable. We put those applications in early, because a flue refused in week ten is one of the most common reasons a hospitality opening moves.

What a restaurant, café or coffee shop fit-out includes

Scope varies with the concept and the demise. These are the elements a hospitality fit-out contract with us usually covers.

  • Survey, feasibility and services strategy

    Extraction route, drainage, gas, water and electrical capacity checked against the equipment schedule before any layout is drawn, because those decide what the unit can be.

  • Coffee counter and barista services

    Counter joinery templated to the equipment schedule, filtered water, drainage and power for machines, grinders and under-counter fridges, and a pass and till position that work in service.

  • Commercial kitchen installation

    Equipment set out and installed, services connections, stainless steel, and wall and floor systems that pass an environmental health inspection.

  • Extraction, make-up air and odour control

    Canopies, ductwork, fans, attenuation, make-up air and odour control specified to the discharge conditions the borough sets.

  • Gas interlock, suppression and drainage

    Gas safety interlock tied to the ventilation, suppression over the cooking line, floor gullies laid to fall and a grease interceptor sized for the kitchen, all commissioned and certified.

  • Bars, counters and front of house joinery

    Bar structure and top, back bar, pass, banquette seating, host stand and wall panelling, made to the surveyed dimensions rather than to a drawing of the room.

  • Finishes, lighting and acoustics

    Floor, wall and ceiling finishes chosen for cleaning and durability, a lighting scheme, and acoustic treatment for a room that has to hold a conversation.

  • Shopfront, signage and handover

    Shopfront glazing, entrance, fascia and signage with consent, then commissioning, certification and a joint snagging walk before your environmental health visit.

What is in the price

We handle

  • Survey, and pricing against the agreed drawings and services
  • Planning, advertisement consent and building control applications
  • Landlord approval submissions and permits to work
  • Strip-out, protection and waste removal
  • Kitchen or counter installation, extraction, gas interlock and suppression
  • Drainage, grease management and floor systems
  • Bar, counter and front of house joinery, finishes and lighting
  • Commissioning, certification and the handover pack

You provide

  • The concept, brand standards and the equipment schedule
  • Lease, licence to alter and the landlord's fit-out guide
  • Catering or coffee equipment where you are buying it directly, delivered to the programme
  • Your premises licence and food business registration applications
  • A single decision-maker available through the fit-out

Not included

  • Planning, licensing and building control fees, paid to the authority
  • Catering and coffee equipment, tills, EPOS and small wares unless specified
  • Loose furniture, tableware and decorative styling
  • Water company connection and trade effluent charges
  • Extended landlord access charges outside the agreed window
  • Any base-build defect that is the landlord's obligation

How it runs

  1. 01

    Feasibility on extraction, drainage and power

    We check the extraction route and discharge position, the drainage falls, and whether the gas, water and electrical supplies will run the equipment schedule. For a coffee shop that can be a short exercise; for a restaurant it is the week that decides the concept. If the unit cannot take it, that is the cheapest week to find out.

    You receive
    A feasibility note on extraction, drainage and services capacity
  2. 02

    Design the kitchen or counter first, then the room

    The kitchen or coffee counter is laid out around the equipment schedule and the services, with the ventilation and drainage designed to it. Only then are the pass, the seating, the bar and the joinery drawn, so nothing front of house is templated before the services behind it are fixed in position.

    You receive
    Agreed kitchen or counter layout, services and front of house layouts
  3. 03

    Consents: flue, shopfront, signage and landlord

    Planning for an external flue or a new shopfront, advertisement consent for signage, the building control application and the landlord approval package, submitted together and early because the flue decision is what usually moves an opening date.

    You receive
    Submitted applications and a written quotation with an opening programme
  4. 04

    Build from the back of the unit forward

    Strip-out, drainage and services first, then ductwork and the kitchen or counter services, then partitions, finishes and joinery, with the counter templated once the equipment is set out. Weekly reports count back to the opening date and every variation is priced before it is built.

    You receive
    Weekly progress reports and inspection records
  5. 05

    Commission, register and hand over

    Extraction balanced, gas interlock and suppression commissioned and certified, electrical testing complete, the water and drainage checked in service, a joint snag, and the pack handed over ready for your environmental health inspection and the food business registration you have already made.

    You receive
    Commissioning certificates, warranties and an O&M pack

What governs a hospitality fit-out

  • Kitchen extraction, odour and noise

    Discharge height, odour control and fan noise are assessed by the borough's environmental health team. An external flue or duct on the elevation almost always needs planning permission, and the assessment follows the published guidance on commercial kitchen exhaust. A coffee shop that only toasts and bakes may avoid it; one that fries will not.

    Control of odour and noise from commercial kitchen exhaust systems ↗
  • Food business registration and finishes

    A food business, including a coffee shop, must be registered with the local authority at least 28 days before opening, and the premises are inspected. Wall, floor and ceiling finishes have to be smooth, impervious and cleanable, and hand-wash provision, storage and waste routes are all examined.

    Register a food business ↗
  • Gas safety and ventilation interlock

    Commercial gas catering appliances require a ventilation interlock so the gas supply shuts down if extraction fails. Installation and commissioning must be carried out by a suitably registered engineer, and the certificate forms part of your handover pack.

    HSE: gas safety ↗
  • Approved Document B: fire safety

    Ductwork crossing compartment lines needs fire protection, suppression is expected over a cooking line, and escape routes have to work with the seating layout rather than around it. This is checked before you are allowed to trade.

    Approved Document B ↗
  • Use class and licensing

    Cafés, coffee shops and restaurants all sit in Class E, so converting a shop rarely needs permission for the use itself, while a drinking establishment or a hot food takeaway does. Alcohol and late hours need a premises licence, which runs on its own timetable (Planning Portal, use classes, checked September 2026).

    Planning Portal ↗

Work of this kind

Common questions

Straight answers.

Not answered here?

Tell us what you are planning. We read every enquiry ourselves.

Ask us directly07424 445105

The counter and everything behind it: joinery templated to the equipment, filtered water and drainage for the espresso machine, power for machines, grinders, fridges and the till, a hand-wash basin, a small prep area and cleanable finishes, plus the seating, lighting, decoration, shopfront and signage in front of it. Where hot food is served, extraction and grease management join the list. Equipment, EPOS and furniture are usually bought by you and connected by us.

Opening a restaurant, café or coffee shop?

Send the unit drawings, the concept, the equipment list and the date you want to open. We will tell you whether the extraction, the drainage and the supplies will support it.