Commercial fit-out contractors in London

Shell and core, Cat A or Cat B, in a unit that is trading or empty. One in-house crew, one fixed price, and a programme written against the date you have to open or occupy.

  • Fixed-price contract
  • Principal contractor, CDM 2015
  • In-house crew
  • Design and build

Updated September 2026

Commercial fit-out in London is the work that turns a leased shell or a previous tenant's space into premises you can trade or work from: partitions, ceilings, floors, services, joinery and finishes. It is described as shell and core, Cat A or Cat B. MO Team delivers all three with its own crew on a fixed-price contract.

Shell and core, Cat A and Cat B

The three terms describe how finished a space is when you take it on. Shell and core is a structure with the base building services brought to the floor and nothing else. Cat A is the landlord's standard: raised floors or screed, suspended ceilings, lighting, base heating and cooling, and a finished common core, but no walls and no identity. Cat B is the occupier's fit-out on top of it, which is where the meeting rooms, the counters, the treatment rooms, the kitchen and the brand actually appear. Interior fit-out projects usually sit in one of those brackets, and knowing which one you are buying is the difference between comparing two prices and comparing two scopes.

We work as a fit-out company for shops, restaurants, cafés, clinics and offices, and the process is the same across all of them. We survey the demise against the landlord's drawings, produce construction drawings, submit them for landlord approval, obtain the permits, then build with one crew and hand over a commissioned, certified space. Two things shape a commercial programme in London more than the construction does. The first is consent: an agreement for lease sets a date, a licence to alter has to be granted before work starts, and a schedule of condition protects you at dilapidations. The second is access. Inside a trading shopping centre the work happens overnight, in a booked window, under a permit each night; in an office building it happens around other tenants, with lift bookings, protected routes and noise curfews.

Being one crew is what makes a fixed commercial price hold. When the ceiling comes down and the base build is not what the drawing showed, our site manager prices the variation and reprograms the same week, rather than waiting on a chain of subcontractors each protecting their own margin. Where a project is bigger than one crew can run properly, we say so at the first meeting instead of thinning ourselves across it.

What a commercial fit-out includes

Scope depends on whether you are buying Cat A, Cat B or both. These are the elements a fit-out contract with us usually contains.

  • Demise survey and scope reconciliation

    The unit surveyed against the landlord's drawings and the lease plan, with base-build defects recorded before you take responsibility for them.

  • Construction drawings and landlord approval

    Drawings, specifications and contractor documentation prepared for landlord approval and the licence to alter.

  • Strip-out and asbestos management

    Previous tenant's fit-out removed, asbestos register checked and a refurbishment survey obtained on pre-2000 buildings.

  • Partitions, ceilings and floors

    Stud, glazed and acoustic partitions, suspended and MF ceilings, raised floors, screeds and floor finishes.

  • Mechanical and electrical services

    Power, lighting, data containment, ventilation, air conditioning connection and fire alarm interface, tested and certified.

  • Joinery and interior fit-out

    Counters, reception desks, tea points, storage, wall panelling and the built elements that carry the brand.

  • Decoration, signage and finishes

    Decoration throughout, wayfinding and internal signage, and shopfront or entrance works where they are in scope.

  • Commissioning, certification and handover

    Services commissioned, certificates issued, a joint snag with your project manager, and an operation and maintenance pack.

What is in the price

We handle

  • Survey, construction drawings and landlord approval submissions
  • Principal contractor duties, construction phase plan and permits
  • Strip-out, protection and licensed waste removal
  • Partitions, ceilings, floors and decoration
  • Electrical, data, ventilation and fire alarm interface works
  • Joinery manufacture and installation
  • Out-of-hours working where the building requires it
  • Commissioning, certification and the handover pack

You provide

  • The lease, the agreement for lease and the landlord's fit-out guide
  • A signed licence to alter before work starts
  • Free access to the demise from the agreed date
  • Furniture, equipment and IT, with delivery dates that match the programme
  • One decision-maker with authority during the fit-out

Not included

  • Landlord approval, surveyor and consent fees
  • Planning, advertisement consent and building control fees
  • Furniture, IT, EPOS and specialist trade equipment
  • Base-build defects that are the landlord's obligation
  • Business rates, service charge and utility standing charges during the works
  • Dilapidations liabilities arising from a previous occupation

How it runs

  1. 01

    Brief, demise survey and feasibility

    We look at the space, take the lease position and the opening date, and say plainly whether the scope fits the date. Base-build defects are recorded in a schedule of condition before anything is agreed.

    You receive
    A survey report, schedule of condition and a budget range
  2. 02

    Design, drawings and approvals

    Layouts and construction drawings, then submission for landlord approval and licence to alter, plus building control and any planning or advertisement consent the works need.

    You receive
    Approved drawings and the consents in place
  3. 03

    Fixed price and programme

    A price fixed against the approved drawings and a written specification, with provisional sums stated separately, and a programme built around the building's access rules rather than an ideal working week.

    You receive
    A fixed-price contract and a dated programme
  4. 04

    Fit-out on site

    Construction phase plan issued, protection and permits in place, then strip-out, first fix, ceilings and partitions, joinery and finishes. Weekly reports, and variations priced before they are built.

    You receive
    Weekly progress reports and priced variations in writing
  5. 05

    Commission, snag and hand over

    Services commissioned and certified, a joint snagging walk with your project manager, and the handover pack assembled as a set so it is not chased after you open.

    You receive
    Certificates, warranties, as-built drawings and an O&M pack

What governs a commercial fit-out

  • CDM 2015

    On a commercial project the client has duties of their own, including appointing a principal designer and a principal contractor in writing. We take the principal contractor role and issue the construction phase plan before mobilisation.

    HSE: CDM 2015 ↗
  • Approved Document B: fire safety

    A fit-out changes compartmentation, escape routes, travel distances and the alarm and sprinkler layout. Those are the elements a building control body and the landlord's own consultant will both examine before you occupy.

    Approved Document B ↗
  • Approved Document M: access to buildings

    Approach, entrance, circulation, sanitary provision and counter heights are controlled in commercial premises. Getting this right at layout stage is far cheaper than moving a WC or a door set after approval.

    Approved Document M ↗
  • Asbestos: duty to manage

    The building owner must hold an asbestos register. Before any strip-out in a building constructed or refitted before 2000 we obtain a refurbishment and demolition survey, and licensed material is removed by a licensed contractor.

    HSE: managing asbestos ↗
  • Building control on commercial work

    Structural alterations, fire safety changes, drainage, ventilation and energy performance are all inspected. Sign-off through your local authority building control team or a registered building control approver is what completes the job on paper.

    LABC ↗

Common questions

Straight answers.

Not answered here?

Tell us what you are planning. We read every enquiry ourselves and reply within one working day.

Ask us directly

It is the work that makes a leased commercial space usable: partitions, ceilings, floors, lighting, power, data, ventilation, joinery and finishes. It sits between the landlord's base building and your furniture and equipment. The term covers shops, restaurants, cafés, clinics, salons, gyms and offices, which differ in their regulations and services but share the same contract and approval structure.

Fitting out a commercial space?

Send the demise drawings, the lease dates and what you need the space to do. We will tell you whether the programme is realistic.