Skip to content
MO TeamConstruction

Commercial

Fit-out contractors in London for shops, cafés, clinics and offices

Shell and core, Cat A or Cat B, in a unit that is trading or empty. One site manager and one team from the demise survey to the handover pack, with a programme written against the date you have to open or occupy.

  • In-house crew
Herono unit fit-out on Brick Lane, London (photo 4)

Updated October 2026

A fit-out contractor turns a leased shell or a previous tenant's space into premises you can trade or work from: partitions, ceilings, floors, services, joinery and finishes, with the landlord's approvals handled along the way. MO Team is a London fit-out contractor that has delivered stores and units for Pop Mart, HEYTEA, Vibean and Herono.

What a fit-out contractor does, and what we have built

A fit-out contractor takes a leased shell, or the last tenant's space, and turns it into premises you can trade or work from: partitions, ceilings, floors, power, lighting, data, ventilation, joinery and finishes, with the landlord's approvals and the building's rules handled along the way. The three terms you will meet describe how finished the space is when you take it on. Shell and core is structure with the base services brought to the floor and nothing else. Cat A is the landlord's standard: raised floor or screed, suspended ceiling, lighting, base heating and cooling and a finished common core, but no walls and no identity. Cat B is the occupier's fit-out on top, which is where the counters, treatment rooms, meeting rooms, kitchen and brand appear. Knowing which one you are buying is the difference between comparing two prices and comparing two scopes.

MO Team is a London fit-out contractor run by Mo, who has been building since 2017, and the fit-outs we have delivered describe us better than adjectives: Pop Mart stores at the Trafford Centre, in Manchester city centre and in Oxford, the HEYTEA tea shop on Parker Street in Liverpool, Vibean Coffee in Manchester and the Herono unit on Brick Lane, plus service works at Sexy Fish in Mayfair. Shops by night, homes by day is how the company describes itself: that retail and hospitality work was built to a brand's approved design package and the landlord's fit-out guide, some of it inside trading centres. The same crew fits out shops, restaurants and cafés, clinics and offices in London, and the process is the same across all of them: survey the demise against the landlord's drawings, build to the drawings agreed for the job, obtain landlord approval and the permits, build under one site manager, and hand over a commissioned, certified space.

Two things shape a commercial programme in London more than the construction does. The first is consent: an agreement for lease sets a date, a licence to alter has to be granted before work starts, and a schedule of condition protects you at dilapidations. The second is access. Inside a trading shopping centre the work usually has to happen out of hours under the centre's permit regime, which we offer where the building requires it; in an office building it happens around other tenants, with lift bookings, protected routes and noise limits set by the borough. Having one programme owner is what keeps a programme honest through both. When the ceiling comes down and the base build is not what the drawing showed, our site manager prices the change and reprogrammes the same week. Where a project is bigger than one team can run properly, we say so at the first meeting instead of thinning ourselves across it. The sectors we fit out page sets out how the requirements differ from one to the next.

What a commercial fit-out includes

Scope depends on whether you are buying Cat A, Cat B or both. These are the elements a fit-out contract with us usually contains.

  • Demise survey and scope reconciliation

    The unit surveyed against the landlord's drawings and the lease plan, with base-build defects recorded before you take responsibility for them.

  • Landlord approval

    The contractor documentation and method statements the landlord's surveyor asks for, submitted with the agreed drawings for approval and the licence to alter.

  • Strip-out and asbestos management

    The previous tenant's fit-out removed, the asbestos register checked and a refurbishment survey obtained on pre-2000 buildings before anything is disturbed.

  • Partitions, ceilings and floors

    Stud, glazed and acoustic partitions, suspended and MF ceilings, raised floors, screeds and floor finishes to the specification.

  • Mechanical and electrical services

    Power, lighting, data containment, ventilation, air conditioning connection and the fire alarm interface, tested and certified.

  • Joinery and interior fit-out

    Counters, reception desks, tea points, storage, wall panelling and the built elements that carry the brand, made to the surveyed dimensions.

  • Decoration, signage and finishes

    Decoration throughout, wayfinding and internal signage, and shopfront or entrance works where they are in scope.

  • Commissioning, certification and handover

    Services commissioned, certificates issued, a joint snag with your project manager, and an operation and maintenance pack.

What is in the price

We handle

  • Survey and landlord approval submissions
  • Method statements, risk assessments and the building's permits to work
  • Strip-out, protection and waste removal
  • Partitions, ceilings, floors and decoration
  • Electrical, data, ventilation and fire alarm interface works
  • Joinery manufacture and installation
  • Out-of-hours working where the building requires it
  • Commissioning, certification and the handover pack

You provide

  • The lease, the agreement for lease and the landlord's fit-out guide
  • A signed licence to alter before work starts
  • Free access to the demise from the agreed date
  • Furniture, equipment and IT, with delivery dates that match the programme
  • One decision-maker with authority during the fit-out

Not included

  • Landlord approval, surveyor and consent fees
  • Planning, advertisement consent and building control fees
  • Furniture, IT, EPOS and specialist trade equipment
  • Base-build defects that are the landlord's obligation
  • Business rates, service charge and utility standing charges during the works
  • Dilapidations liabilities arising from a previous occupation

How it runs

  1. 01

    Read the lease before the space

    We take the agreement for lease, the landlord's fit-out guide and the demise drawings, survey the unit against them and record base-build defects in a schedule of condition before anything is agreed. The programme is written from the dates in those documents, not from a hopeful conversation.

    You receive
    A survey report, a schedule of condition and a written budget range
  2. 02

    Drawings and landlord approval

    The agreed drawings and specification submitted to the landlord's surveyor, with the contractor documentation and method statements the licence to alter requires, plus building control and any planning or advertisement consent the works need.

    You receive
    Approved drawings and the consents in place
  3. 03

    Price and programme against the approved pack

    A written quotation against the approved drawings and specification, with provisional sums stated separately so you can see which part of the figure is firm, and a programme built around the building's access rules rather than an ideal working week.

    You receive
    A written quotation and a dated programme
  4. 04

    Fit-out on site

    Permits and protection in place, then strip-out, first fix, ceilings and partitions, joinery and finishes in sequence, with a weekly report against the date you have to open and every variation priced before it is built.

    You receive
    Weekly progress reports and priced variations in writing
  5. 05

    Commission, snag and hand over

    Services commissioned and certified, a joint snagging walk with your project manager, and the handover pack assembled as a set so it is not chased after you open: certificates, as-built drawings and the operation and maintenance manual.

    You receive
    Certificates, as-built drawings and an O&M pack

What governs a commercial fit-out

  • CDM 2015

    CDM 2015 applies to every commercial fit-out. Where more than one contractor is involved the client appoints a principal designer and a principal contractor in writing, a construction phase plan is written before work starts, and a health and safety file is handed over at the end. Ask every contractor you shortlist who will hold each role on your project and to show you the plan before mobilisation.

    HSE: CDM 2015 ↗
  • Approved Document B: fire safety

    A fit-out changes compartmentation, escape routes, travel distances and the alarm and sprinkler layout. Those are the elements a building control body and the landlord's own consultant will both examine before you occupy, and they are cheaper to get right on the drawing than after the ceiling is up.

    Approved Document B ↗
  • Approved Document M: access to buildings

    Approach, entrance, circulation, sanitary provision and counter heights are controlled in commercial premises. Getting this right at layout stage is far cheaper than moving a WC or a door set after approval.

    Approved Document M ↗
  • Asbestos: duty to manage

    The building owner must hold an asbestos register. Before any strip-out in a building constructed or refitted before 2000 we obtain a refurbishment and demolition survey, and licensed material is removed by a licensed contractor before general works begin.

    HSE: managing asbestos ↗
  • Building control on commercial work

    Structural alterations, fire safety changes, drainage, ventilation and energy performance are all inspected. Sign-off through your local authority building control team or a registered building control approver is what completes the job on paper.

    LABC ↗

Work of this kind

Common questions

Straight answers.

Not answered here?

Tell us what you are planning. We read every enquiry ourselves.

Ask us directly07424 445105

A contractor who takes a commercial space from the state the landlord hands it over in to the state you can trade or work in. That covers strip-out, partitions, ceilings, floors, electrical and mechanical services, joinery, decoration and signage, and also the paperwork around them: the landlord's approval, the licence to alter, building control and the permits the building requires. A good one owns the programme and the handover pack as much as the construction.

Fitting out a commercial space in London?

Send the demise drawings, the lease dates and what you need the space to do. We will tell you whether the programme is realistic and what it takes to hold it.

Call usGet a quote