Skip to content
MO TeamConstruction

Residential · Structural

Underpinning, basements and structural alterations in London

You are not buying the wall coming down. You are buying the temporary works that hold the house up while it does, and the calculation that says the new arrangement is sound.

  • Fixed-price contract
  • Principal contractor, CDM 2015
  • In-house crew

Updated October 2026

Structural alterations in London cover removing loadbearing walls, installing steel beams, forming openings, underpinning existing foundations and building basements. Every one needs a structural engineer's calculation, temporary works, building control inspection and, near a boundary, a party wall notice. MO Team takes it all on under one contract, with its own team on the build.

What structural work actually buys

Three jobs sit under this heading. Removing a loadbearing wall or forming a wide opening, which is what most people mean by a knock-through. Underpinning, which deepens or replaces existing foundations, usually because of subsidence or because a new structure alongside needs to go deeper, and the underpinning cost guide sets out the published prices per metre and per job. And basement work, which is either converting an existing cellar or excavating a new one below the house. They look different and share one thing: the building has to be supported while the thing that supports it is removed.

A structural engineer engaged for the job produces the calculations and the temporary works design, we lodge the building control application, serve any party wall notice, then our own crew props, cuts, installs, and makes good. Working in London terraces means the loads generally end up on a party wall, which is why the Party Wall etc. Act is in almost every one of these jobs and why notice periods, not the steel, set the start date. Clay subsoil and mature street trees are the other constant: shrinkable clay is the reason so much London underpinning exists, and the cause is frequently a tree rather than the building. Access decides method. Where a beam cannot come down a terrace's side alley, it arrives in sections and is spliced, and that is a design decision made before pricing rather than a problem discovered on the day.

One team is worth the most here because temporary works are where structural jobs go wrong. The props, needles and removal sequence follow the engineer's temporary works design, and the crew that puts them in is the crew on site when the wall comes out. A subcontracted opening priced without that design is cheaper on paper and is the reason cracks appear in rooms nobody touched. The same crew takes on structural work across London, and where our project record names the place, we say so. In central London that is service works at Sexy Fish in Mayfair, and in east London a retail fit-out for Herono on Brick Lane; both are commercial fit-out jobs. In north, south and west London we have no job with a recorded place to show you: our underpinning and structural works, like our other home projects, are recorded only as London. The areas we cover page sets out where we build.

What structural alterations include

Priced as one package: the calculation, the temporary works, the permanent structure and the sign-off.

  • Structural survey and feasibility

    What the wall is carrying, what the foundations are, and whether the opening or excavation you want is achievable.

  • Structural engineer's calculations

    Beam and column sizing, padstones, bearing checks, and the drawings building control will inspect against.

  • Temporary works design

    Propping, needling and the removal sequence, designed rather than improvised, so nothing above moves while the wall is out.

  • Load-bearing wall removal and steel beam installation

    Cutting, beam installation, padstones, connections, and packing to eliminate deflection before the props come out.

  • Underpinning

    Mass concrete underpinning in engineered bays, sequenced to the engineer's design, with each pit inspected before pouring.

  • Basement construction and conversion

    Excavation, retaining structure, waterproofing to a defined grade, drainage, escape provision and ventilation.

  • Party wall notices and building control

    Notices prepared and served, schedules of condition arranged, and inspections booked at each structural stage.

  • Fire protection and making good

    Encasement or intumescent protection to exposed steel, plastering, flooring and decoration to the affected rooms.

What is in the price

We handle

  • Structural survey, calculations and drawings
  • Temporary works design, propping and needling
  • Building control application and stage inspections
  • Party wall notices prepared and served
  • Excavation, underpinning and concrete works
  • Steel supply, installation, connections and fire protection
  • Waterproofing and drainage to a basement
  • Making good, plastering and decoration to the affected rooms

You provide

  • Access to every room affected, including the neighbours' agreement where the Act requires it
  • Any existing structural drawings, deeds or survey reports you hold
  • Insurer and loss adjuster details where the work follows a subsidence claim
  • Freeholder consent where the property is leasehold
  • Rooms cleared of furniture along the working route

Not included

  • Building control and planning fees, paid to the authority
  • Party wall surveyor fees, including the neighbour's appointed surveyor
  • Tree works or root management where an arboricultural report recommends them
  • Monitoring periods requested by an insurer before work is authorised
  • Basement fit-out beyond the shell, unless separately specified
  • Redecoration of rooms not disturbed by the works

How it runs

  1. 01

    Structural survey

    We establish what the wall carries, what the foundations are and how deep they go, and whether cracking is historic or active. Where subsidence is suspected, that answer decides whether the job is a repair or an insurance claim.

    You receive
    A survey note stating what is structural and what is not
  2. 02

    Engineering and temporary works

    Calculations for the permanent structure, and a separate design for how the building is supported while the work happens. Both are drawn, and both are what building control inspects against.

    You receive
    Structural calculations and a temporary works design
  3. 03

    Notices, approvals and fixed price

    Building control application lodged, party wall notices served with a schedule of condition, and a fixed price written against the engineer's drawings rather than against an estimate of the work.

    You receive
    Submitted applications, served notices and a fixed-price contract
  4. 04

    Support, remove, install

    Props and needles in first, then the removal or excavation in the sequence the engineer set out. Underpinning proceeds bay by bay, never as a continuous trench. Each stage is inspected before the next begins.

    You receive
    Stage inspection records and photographs of the works before covering up
  5. 05

    Protect, make good and sign off

    Fire protection to exposed steel, packing and pinning checked, props struck, then plastering, flooring and decoration. Building control issues the completion certificate.

    You receive
    Completion certificate, calculations and a closed-out snagging list

Regulations that apply to structural work

  • Approved Document A: structure

    Any alteration that changes how load travels through a building is controlled. Calculations, beam sizing, bearings and padstones are submitted, and building control inspects the opening before it is covered.

    Approved Document A ↗
  • Party Wall etc. Act 1996

    Cutting into a party wall requires a two-month party structure notice. Excavating within three metres to a lower depth than a neighbour's foundations requires a one-month notice, and underpinning almost always triggers it.

    Party Wall etc. Act 1996 ↗
  • Approved Document B: fire safety

    Exposed structural steel usually needs 30 or 60 minutes of protection, by encasement or an intumescent system. A new basement also needs a compliant escape route, which frequently decides where the stair can go.

    Approved Document B ↗
  • CDM 2015 and temporary works

    Structural alteration is high-risk work. We act as principal contractor, prepare a construction phase plan, and treat the temporary works as a design in its own right rather than as something decided by whoever is holding the prop.

    HSE: CDM 2015 ↗
  • Basement planning policy

    Several London boroughs run specific basement policies that limit depth, footprint and garden coverage, and require a basement impact assessment covering groundwater, stability and drainage. This is checked for the address before any design work starts.

    Planning Portal ↗

Work of this kind

Common questions

Straight answers.

Not answered here?

Tell us what you are planning. We read every enquiry ourselves.

Ask us directly07424 445105

Underpinning deepens or replaces existing foundations, normally in engineered bays of mass concrete poured in a set sequence. A house needs it when the ground under the current foundation can no longer support it, usually shrinkable clay affected by a nearby tree, a leaking drain washing out fines, or an adjacent excavation. It is a last resort after monitoring, drain repair and tree management have been considered.

Got cracks, or a wall you want gone?

Send photographs of the cracking or the wall, and the address. We will tell you whether it needs an engineer, a builder, or your insurer.

Call usGet a quote