Residential · Structural
Underpinning, basements and structural alterations in London
You are not buying the wall coming down. You are buying the temporary works that hold the house up while it does, and the calculation that says the new arrangement is sound.
- Fixed-price contract
- Principal contractor, CDM 2015
- In-house crew
- Design and build
Updated September 2026
Structural alterations in London cover removing loadbearing walls, installing steel beams, forming openings, underpinning existing foundations and building basements. Every one needs a structural engineer's calculation, temporary works, building control inspection and, near a boundary, a party wall notice. MO Team engineers, builds and signs off all of it under one contract.
What structural work actually buys
Three jobs sit under this heading. Removing a loadbearing wall or forming a wide opening, which is what most people mean by a knock-through. Underpinning, which deepens or replaces existing foundations, usually because of subsidence or because a new structure alongside needs to go deeper. And basement work, which is either converting an existing cellar or excavating a new one below the house. They look different and share one thing: the building has to be supported while the thing that supports it is removed.
We run structural work as design and build. Our engineer produces the calculations and the temporary works design, we lodge the building control application, serve any party wall notice, then our own crew props, cuts, installs, and makes good. Working in London terraces means the loads generally end up on a party wall, which is why the Party Wall etc. Act is in almost every one of these jobs and why notice periods, not the steel, set the start date. Clay subsoil and mature street trees are the other constant: shrinkable clay is the reason so much London underpinning exists, and the cause is frequently a tree rather than the building. Access decides method. Where a beam cannot come down a terrace's side alley, it arrives in sections and is spliced, and that is a design decision made before pricing rather than a problem discovered on the day.
One team is worth the most here because temporary works are where structural jobs go wrong. Propping, needling and the sequence of removal are designed alongside the permanent structure, by people who will be on site when the wall comes out. A subcontracted opening priced without a temporary works design is cheaper on paper and is the reason cracks appear in rooms nobody touched.
What structural alterations include
Priced as one package: the calculation, the temporary works, the permanent structure and the sign-off.
What is in the price
How it runs
- 01
Structural survey
We establish what the wall carries, what the foundations are and how deep they go, and whether cracking is historic or active. Where subsidence is suspected, that answer decides whether the job is a repair or an insurance claim.
- You receive
- A survey note stating what is structural and what is not
- 02
Engineering and temporary works
Calculations for the permanent structure, and a separate design for how the building is supported while the work happens. Both are drawn, and both are what building control inspects against.
- You receive
- Structural calculations and a temporary works design
- 03
Notices, approvals and fixed price
Building control application lodged, party wall notices served with a schedule of condition, and a fixed price written against the engineer's drawings rather than against an estimate of the work.
- You receive
- Submitted applications, served notices and a fixed-price contract
- 04
Support, remove, install
Props and needles in first, then the removal or excavation in the sequence the engineer set out. Underpinning proceeds bay by bay, never as a continuous trench. Each stage is inspected before the next begins.
- You receive
- Stage inspection records and photographs of the works before covering up
- 05
Protect, make good and sign off
Fire protection to exposed steel, packing and pinning checked, props struck, then plastering, flooring and decoration. Building control issues the completion certificate.
- You receive
- Completion certificate, calculations and a closed-out snagging list
How long structural work takes
On-site duration once approvals and party wall notices are complete. The notice periods in front of the work are usually longer than the work itself.
Regulations that apply to structural work
Common questions
Straight answers.
Not answered here?
Tell us what you are planning. We read every enquiry ourselves and reply within one working day.
Ask us directlyGot cracks, or a wall you want gone?
Send photographs of the cracking or the wall, and the address. We will tell you whether it needs an engineer, a builder, or your insurer.