Chimney breast removal in London

The brickwork is the quick part. What matters is what holds up the chimney above it afterwards, and who has checked the sums.

  • In-house crew
  • Design and build

Updated September 2026

Removing a chimney breast takes the fireplace and its brickwork out of a room and leaves the chimney above supported on gallows brackets or a steel beam, designed by a structural engineer and inspected by building control before it is covered. Published London guides put a single-floor removal at £2,000–£5,000. MO Team removes chimney breasts as structural work across London.

What is actually holding the chimney up

In a London terrace the chimney breasts sit back to back on the party wall, one on each floor, and each carries the one above it up to a stack that is often shared with next door. Take out the ground-floor breast and the first-floor breast and the stack are left hanging on nothing, which is why the job is a structural alteration rather than a demolition. There are two ways to hold what remains. Gallows brackets are steel brackets bolted into the wall beneath the cut, and they are the cheaper option where building control will accept them: a wall in sound condition, a breast that is only coming out on one floor, and a neighbour's breast still in place on the other side of the party wall. A steel beam bearing on padstones is the default where more than one floor is removed, where the wall is doubtful, or where the brickwork above is heavier than brackets are designed for. Full removal, breast and stack together, adds roof work and scaffold and turns a two-room job into a whole-house one.

The paperwork is the same whichever support is used. A structural engineer sizes the brackets or the beam against the weight left above, and London practices quote £450–£800 for a single-beam calculation. Building control is notified, inspects the support before it is boxed in and issues the completion certificate a buyer's solicitor will ask for later; Hillingdon publishes a charge of £360 including VAT for a chimney breast removal (2025/26 schedule). Where the breast is on the party wall, cutting into the wall to fix brackets or bear a beam and cutting away the projecting breast are rights under section 2 of the Party Wall etc. Act 1996, which means a party structure notice to the neighbour at least two months before work starts and, if they do not consent in writing within 14 days, a surveyor's award at £700–£1,800 per adjoining owner. Planning permission is not normally needed for internal work, though a listed house needs consent and removing an external stack in a conservation area is worth checking with the borough. Published London guides put the whole package for one floor at £2,000–£5,000 and full removal including the stack at £6,000–£10,000, the second figure resting on a single London source.

We do this as part of our structural alterations work: the survey, the engineer, the notices, the propping, the support and the making good under one contract and one crew, rather than a builder who cuts and an engineer you have to find yourself. We will also tell you plainly when brackets will not pass and a beam is the honest answer, because the cheaper option is only cheaper if building control signs it off. The same team handles the wall that so often comes out at the same time, covered on our load-bearing wall removal page, and our guide to party wall agreements in London explains the notice and what happens if a neighbour objects.

What chimney breast removal includes

Priced as one package: the check on what is above, the calculation, the support, the inspection and the finished room.

  • Survey of the stack, floor by floor

    Which breasts remain, whether the stack is shared, whether any flue is still in use on either side, and the condition of the party wall the support will fix into.

  • Structural engineer's calculation

    Brackets or a beam sized against the brickwork left above, with the drawing building control inspects against and a party wall surveyor can read.

  • Building control application and inspections

    Notification before work starts, an inspection of the support before it is closed in, and the completion certificate at the end.

  • Party wall notices

    A party structure notice prepared and served where the breast sits on the party wall, with the two-month period built into the programme.

  • Propping and protection

    Temporary support to the breast above, floor protection, dust screens and a sealed room so the rest of the house stays usable.

  • Removal and the new support

    The breast taken down within the room, gallows brackets or a steel beam and padstones installed, packed tight and inspected before it is cased.

  • Flue sealed and ventilated

    The remaining flue capped or ventilated so it stays dry, and any fireplace kept on another floor left working.

  • Making good

    Plaster to the wall, the floor patched where the hearth was, skirting run through and the room decorated where the work touched it.

What is in the price

We handle

  • Survey, engineer's calculation and drawing
  • Building control notification and stage inspections
  • Party wall notice prepared and served
  • Propping, dust protection and waste removal
  • Removal of the breast and installation of brackets or a steel beam
  • Sealing and ventilating the remaining flue
  • Plastering, floor patching, skirting and decoration to the affected wall

You provide

  • Access to the rooms above and below the breast for the survey and the propping
  • The neighbour's name and address for the party wall notice
  • Any existing drawings, previous building control certificates or survey reports
  • A decision on what happens to any fireplace on the floors that keep their breast
  • Furniture moved out of the room before the crew arrives
  • Freeholder consent where the property is a flat

Not included

  • Building control and party wall surveyor fees, including a neighbour's own surveyor
  • Rebuilding or repointing the stack above the roof unless it is quoted
  • A new flue liner where a fireplace elsewhere is brought back into use
  • Licensed asbestos removal if a survey finds it in the old fireplace or flue
  • Redecoration of rooms the work did not touch
  • Floor finishes beyond patching where the hearth stood

How it runs

  1. 01

    Look above and next door

    Before anything is priced we establish what the breast is carrying: which floors still have a breast, whether the stack above the roof is shared, whether anyone on either side still uses a flue, and whether the party wall is sound enough to take brackets. We also check the floor construction, because the hearth usually sits on its own brick trimmer.

    You receive
    A marked-up sketch of the stack, floor by floor, and a recommendation: brackets or steel
  2. 02

    Get the calculation

    Our engineer sizes the support for the weight left above, the remaining breast, the flue and the stack, and specifies either the gallows brackets and their fixings or a beam with its padstones. The calculation is what building control checks and what a party wall surveyor will want to see.

    You receive
    Structural calculations and a drawing you can hand to building control and to a surveyor
  3. 03

    Serve notice and lodge the application

    Where the breast is on the party wall, the party structure notice goes to the neighbour at least two months before the start date. Building control is notified at the same time and the inspection is booked, so the two-month period, not the site work, sets the earliest start.

    You receive
    A served notice, a building control reference and a start date that respects the notice period
  4. 04

    Prop, remove, support

    The room is sealed and the breast above is propped. The brickwork comes down from the top of the room to the hearth, within the room rather than through the wall, then the brackets or the beam go in and are packed tight to the brickwork above. Building control inspects before anything is boxed in.

    You receive
    The support installed, inspected and photographed before it is cased
  5. 05

    Seal, ventilate, make good

    The flue left above is capped or ventilated so it cannot draw damp, the support is cased and plastered, the floor is patched where the hearth was and the skirting runs straight through. Building control issues the completion certificate, and the certificate and the calculation go in your handover pack.

    You receive
    A completion certificate and a room with no trace of the breast

Regulations that apply to chimney breast removal

  • Building Regulations: structure

    Removing a breast changes how the weight of the chimney reaches the ground, so the work is controlled. The support is designed to Approved Document A, submitted to building control, inspected before it is covered and recorded on a completion certificate.

    Approved Document A ↗
  • Party Wall etc. Act 1996, section 2

    Cutting into a party wall to fix brackets or bear a beam, and cutting away a chimney breast that projects from it, are section 2 rights. They need a party structure notice at least two months before work starts; if the neighbour does not consent in writing within 14 days a dispute is deemed to have arisen and surveyors settle it by an award.

    Party Wall etc. Act 1996 ↗
  • Planning permission

    Internal alterations, including removing a chimney breast, do not normally need a planning application. A listed building needs listed building consent for significant internal work, and removing a stack from the roof in a conservation area should be checked with the borough before it is priced.

    Planning Portal: internal walls ↗
  • Building Regulations: combustion appliances and flues

    Where a fireplace on another floor or a neighbour's fireplace still uses the stack, that flue has to stay sound, separate and ventilated after the work. Approved Document J covers flues and chimneys, and the engineer's design accounts for any flue that remains in use.

    Approved Document J ↗

Work of this kind

Common questions

Straight answers.

Not answered here?

Tell us what you are planning. We read every enquiry ourselves and reply within one working day.

Ask us directly07424 445105

Published London guides put removing a chimney breast on one floor at £2,000–£5,000 as a package, with gallows brackets at the lower end and a steel beam at the upper end, including the engineer and building control. Full removal of every breast and the stack is quoted at £6,000–£10,000 by the one London source that prices it, so treat that as indicative. Party wall fees of £700–£1,800 per neighbour come on top where the breast is on a shared wall. These are September 2026 market ranges, not our quotes.

Want the fireplace gone and the room back?

Send a photo of the breast, one of the room above it and the address. We will say whether brackets are likely to pass, whether the neighbour needs a notice, and roughly what the job involves before anyone visits.