Kitchen renovation in London
Most kitchen projects are really ground-floor projects. We draw the room, price the drawing, and fit it with our own kitchen fitters rather than a chain of subcontractors.
- Fixed-price contract
- Principal contractor, CDM 2015
- In-house crew
- Design and build
Updated September 2026
A kitchen renovation in London usually takes eight to fourteen weeks on site and covers strip-out, first-fix electrics and plumbing, plastering, flooring, unit and worktop installation, then second fix and snagging. Where a wall comes out, structural calculations and building control sign-off are needed, which adds time before the work starts rather than during it.
What a kitchen renovation involves
Most kitchen projects are not really about kitchens. They are about how the ground floor works: whether cooking, eating and sitting happen in one space or three, where the light comes from, and whether the room can take a wider opening. In a London terrace that last question is usually the expensive one, because the wall between the kitchen and the dining room is often loadbearing and the answer is a steel, a calculation and a building control inspection rather than a sledgehammer.
We work in one order and we do not vary it. A measured survey, a conversation about how you actually use the room, then a layout, an elevation set and a finishes and appliance schedule before anyone quotes a price. A quotation drawn from a proper set of drawings is a number you can hold us to; a quotation drawn from a conversation is a guess that moves once work starts. After that our own crew strips out, first fixes, plasters, lays the floor, fits units, templates and installs worktops, and second fixes. The London detail sits around the edges: a skip permit or a suspended bay from the borough, delivery routes that work inside a low traffic neighbourhood, and each borough's own hours for noisy work. In a flat, the freeholder and the building manager set the rules on lifts, hours and waste.
Because we design and build, there is no gap between the drawing and the person fitting it. If something will not work on site we find it at the drawing stage, where it costs an hour, rather than at second fix, where it costs a fortnight. It also means one warranty. A worktop that does not meet the wall properly is our problem whether the cause was the setting out or the template. The same applies to the parts of a kitchen that are easy to underestimate: the floor build-up under a heavy island, the ventilation path for an extractor that has to reach an outside wall, and the making good to the rooms either side of an opening. Those are priced in the specification rather than raised as extras once the units are on site.
What a kitchen renovation includes
A full kitchen renovation covers all of the following as one package, priced against the drawings.
What is in the price
How it runs
- 01
Measured survey and brief
We measure the room properly and talk through how you use it, what is not working, and what the budget needs to cover. Wall construction and service positions are checked at the same visit.
- Typically
- Week 1
- You receive
- Existing-condition drawing and a budget range
- 02
Design and drawings
Layout options, then a developed set: plans, elevations, and a finishes and appliance schedule. Appliance dimensions are fixed here, because they drive the cabinetry.
- Typically
- Weeks 2–4
- You receive
- Drawing set and finishes schedule
- 03
Fixed quotation and approvals
We price the drawings, not a conversation. You get a fixed figure, a start date and a week-by-week programme, plus the building control application and any party wall notice where a wall is coming out.
- Typically
- Week 5
- You receive
- Fixed quotation, programme and submitted applications
- 04
On site
Strip-out, structural work, first fix, plaster, floor, units, worktops and second fix, in that order. A weekly update whether or not there is news.
- Typically
- 8–14 weeks
- You receive
- Weekly progress update and inspection records
- 05
Snagging and handover
We walk the room with you, list anything outstanding, and close it out before asking for the final payment.
- Typically
- Final week
- You receive
- Handover pack, certificates and warranties
How long a kitchen takes
On-site duration. Where a structural opening is involved, the approvals in front of it usually take longer than the build.
Regulations and compliance
Common questions
Straight answers.
Not answered here?
Tell us what you are planning. We read every enquiry ourselves and reply within one working day.
Ask us directlyThinking about your kitchen?
Send the room dimensions and roughly what you have in mind. We will come back with an honest view on scope, programme and budget before anyone commits to anything.