Bathroom renovation in London, fitted by our own team
The parts you never see decide whether a bathroom lasts. Waterproofing, falls, ventilation and a properly built floor come before anything is chosen from a showroom.
- Fixed-price contract
- In-house crew
- Design and build
Updated September 2026
A bathroom renovation in London strips the room back to structure and rebuilds it: new drainage and pipework, electrics, tanking, floor build-up, tiling, sanitaryware and ventilation. MO Team supplies its own bathroom fitters, plumbers, electricians and tilers, works to one fixed price, and issues the electrical certificate at handover.
What a bathroom refurbishment involves
Most bathroom work in London falls into three jobs. A like-for-like replacement keeps the drainage where it is and changes what you see. A reconfiguration moves the WC, bath or shower, which means moving waste runs and rebuilding the floor. An addition creates a bathroom where there was not one, usually an en-suite carved out of a bedroom or a second bathroom in a box room. The third is the one worth planning properly, because a new soil connection and a boxed-in stack are what make it work or not. Whichever it is, the order of work does not change: strip out to the structure, sort the drainage and the floor, tank the wet areas, then tile and fit. A bathroom that fails does so from the bottom up, and almost always because that order was compressed.
We do the whole thing with our own people. A survey establishes what the floor is made of, where the stack runs and whether the ventilation is adequate; drawings and a tile-and-sanitaryware schedule settle the specification; a fixed price is written against it; then our fitters strip out, first fix, tank, tile and second fix in one continuous run rather than waiting on separate trades. The London specifics matter here more than people expect. Timber floors in Victorian and Edwardian houses flex, and flexing floors crack tile and grout, so the build-up is a structural decision rather than a finish. Waste runs in a terrace often have to reach an external stack at the back. In a flat, the freeholder's consent and the building's rules on noise, water isolation and waste removal set the programme, and a leak into the flat below is a liability question rather than a snag.
One team keeps a small room honest. On a bathroom there is no space for trades to work around each other, so the order is fixed and the crew is the same from strip-out to grout. That is also what makes a fixed price reasonable: the plumber who sets the falls is the one who will be back if they are wrong.
What a bathroom renovation includes
One package, from protecting the landing carpet to the final silicone bead.
What is in the price
How it runs
- 01
Survey and layout
We measure the room, lift a board where we can, find the stack, check the floor structure and the ventilation, and set out what the layout will allow. Moving a WC is the decision that changes the price most.
- You receive
- A layout drawing and a finishes schedule
- 02
Specification and fixed price
Every item named: suite, brassware, tile, grout, screen, extractor and floor build-up. A fixed price against that list, with what is excluded stated plainly.
- You receive
- A written specification and a fixed-price contract
- 03
Strip-out and first fix
Protection down first, then strip-out to the structure. Waste and supply pipework, electrical circuits and extraction ducting installed, and the floor strengthened and levelled.
- You receive
- A first-fixed room ready for tanking, with services tested
- 04
Tanking and tiling
Wet areas tanked as a system rather than a coat of paint, formers and drains set to fall, then wall and floor tiling. This is the stage that decides whether the room is still sound in ten years.
- You receive
- A tanked and tiled room
- 05
Second fix and handover
Suite, brassware, screens and accessories fitted, extraction commissioned, silicone finished, and the room cleaned. We walk the snagging list with you.
- You receive
- Electrical certificate, warranties and a closed-out snagging list
How long a bathroom takes
Working days on site, assuming materials are on site before we start. Tile lead times, not construction, are the usual cause of a delay.
Regulations that apply to a bathroom
Common questions
Straight answers.
Not answered here?
Tell us what you are planning. We read every enquiry ourselves and reply within one working day.
Ask us directlyPlanning a new bathroom?
Send a photo of the room and rough dimensions. We will tell you what the layout allows and what it is likely to cost.