Typical London prices for a like-for-like refit, a new layout, a wet room and a new en-suite, compiled in September 2026 from published cost guides, with what moves the figure and what is not in it.

Family bathroom, typical London range

£5,000–£14,000

per projectVAT varies by source; see the noteTypical London prices, September 2026

Typical London prices compiled in September 2026 from published cost guides (TrustBuilt Projects, Buildaway, All Well Property Services and Albert Construction), not a quotation from MO Team Construction. The sources are a mix of prices with and without VAT and differ on whether sanitaryware and tiles are included, so treat each range as a planning bracket and confirm both points on any quote you receive.

Published London guides put a bathroom renovation at about £5,000–£8,000 for a like-for-like refit that keeps the layout, £8,000–£14,000 where the layout changes, £6,000–£16,000 for a wet room and £6,000–£13,000 for a new en-suite, at 2026 prices. Those are market ranges from the sources named below, not a quote from MO Team; some include VAT and some do not, and sanitaryware and tiles are often priced separately.

What each type of bathroom job costs

Where these figures come from: each range is the median of the lows and highs published for London in 2026 by TrustBuilt Projects, Buildaway, All Well Property Services and Albert Construction, with TB&D Construction for the en-suite row, rounded to the nearest five hundred pounds. Only one of the four states its VAT position, and one excludes sanitaryware and tiles. They are market figures, not our quotes: for a price on your own room, see bathroom renovation in London and the bathrooms we have fitted. The building regulations and VAT rules quoted on this page are from the Planning Portal and gov.uk's VAT for builders, checked September 2026; confirm what is notifiable with your borough's building control team.

ScenarioTypical rangeWhat that includes
Bathroom refit, same layoutLike-for-like; one source excludes sanitaryware and tiles£5,000–£8,000Strip-out, new suite in the same positions, tiling to the wet area, second fix and making good; check whether the suite and tiles are in the quote
Bathroom renovation with a new layoutMoving the soil pipe alone is quoted at £1,500–£3,000£8,000–£14,000Strip-out, moved WC, basin or shower with new plumbing and drainage, full tiling to the wet areas, second fix and making good
Wet room conversionThe widest spread of any bathroom row, because the floor scope varies£6,000–£16,000Floor rebuilt to falls, full tanking, drainage to a gully, tiling, screen and fittings
New en-suite, creation or conversionCompact rooms sit at the low end; a master en-suite inside a whole-house project at the top£6,000–£13,000A compact shower room created from a bedroom corner or a cupboard, with new drainage, tiling and fittings

VAT: bathroom work in an existing home is standard-rated at 20%. Of the four London guides behind these ranges only one says its figures exclude VAT; the others do not state it. Ask every fitter whether the quote includes VAT, and whether it includes the suite and the tiles.

What moves the price

  • Whether the layout moves

    the gap between the two main brackets — Keeping the WC, basin and bath where they are keeps the soil pipe and the hot and cold runs short. Moving the WC means a new soil connection, and one London guide prices moving a soil pipe at £1,500–£3,000 on its own before the rest of the work. That is most of the difference between a £5,000–£8,000 refit and an £8,000–£14,000 renovation.

  • The labour, not the suite

    the larger share in London — Strip-out, first fix plumbing and electrics, tanking, tiling, second fix and decoration involve four or five trades in a small room that only one of them can work in at a time. A cheaper suite saves a few hundred pounds; the walls still need plumbing, boarding and tiling.

  • Tiling area and format

    labour hours and waste — Floor-to-ceiling tiling, large-format porcelain that needs two people to lift and mosaics that need cutting around every fitting all add hours. Tiling to shoulder height with painted walls above is the usual saving, and it looks deliberate rather than economical.

  • Wet rooms and tanking

    £6,000–£16,000 with a wide spread — A level-access wet room needs the floor rebuilt to falls and the whole room tanked, and on a timber floor that means new decking or a former under the screed. That scope varies from house to house, which is why the wet room row disagrees more than any other, from £6,000 to £16,000.

  • What is behind the tiles

    found on day one, not at survey — Rotten joists under an old bath, lead or corroded pipework, a soil stack that has to be replaced, damp behind a shower that has leaked for years: London terraces and converted flats hide all of them. A sensible quote states what it assumes and what happens if the assumption is wrong.

  • Flats, freeholders and access

    time more than money — A bathroom above ground floor means carrying everything up, protecting the common parts and, in many leasehold flats, a licence for alterations from the freeholder before the plumbing can be touched. None of it is expensive on its own; all of it stretches the programme.

What is and is not in these figures

Usually included

  • Strip-out and disposal of the old bathroom
  • First fix plumbing and electrics, including the extractor fan
  • Tanking to the shower or wet area
  • Wall and floor tiling and grouting
  • Installation of the suite, shower, brassware and accessories
  • Second fix, sealing, snagging and making good within the room

Usually extra

  • The sanitaryware, brassware and tiles, where the guide says you supply them
  • Moving the soil stack or new drainage runs beyond the room
  • Underfloor heating and towel-rail circuits, unless specified
  • Redecorating the landing or adjoining rooms
  • Skip permits and parking bay suspensions charged by the borough
  • VAT, where the source quoted without it

The costs people forget to budget for

  • The suite, the tiles and the brassware

    often outside the labour figure

    At least one of the London guides behind these ranges excludes sanitaryware and tiles entirely, and several fitters quote labour only. Decide who is buying what before comparing quotes, and remember that tiles are ordered with wastage on top of the area measured.

  • Building control for new drainage or a new bathroom

    £512–£515

    New drainage, a new bathroom where there was none, or notifiable electrical work needs Building Regulations sign-off. The local-authority charge for other works up to £5,000 in value is £512–£515 including VAT in the two London boroughs whose schedules we read (Havering and Redbridge), unless the electrician self-certifies under a competent person scheme.

  • A skip on the street

    £300–£425 per skip

    An 8-yard builder's skip in London, before the borough's road permit of £30–£120. A bathroom strip-out usually fills one. A skip on a suspended parking bay adds an administration fee and a daily charge set by the borough.

  • A contingency for what is behind the tiles

    budget for it, spend it rarely

    On a house or conversion more than a few decades old, keep a contingency line for rotten timber, failed pipework and damp discovered at strip-out. The usual advice is around a tenth of the contract value. If it is not needed, it goes back in your pocket; if it is, the job does not stop.

How the borough charges vary across London

Bathroom prices are not published borough by borough, but the cost of putting a skip or a delivery bay outside the house is, and it varies more than most people expect. Two published examples, from the councils' own pages.

BoroughTypical upliftNotes
Wandsworth£82.20–£93.20 booking feePer suspension with ten or seven working days' notice, plus £43.40–£77.40 per 5 m space per day for a skip or materials licence, tiered by duration (charges dated 1 March 2024)
Hackney£100 administrationPer suspension, plus £44 per bay per day; a late application adds £161

Common questions

Straight answers.

Not answered here?

Tell us what you are planning. We read every enquiry ourselves and reply within one working day.

Ask us directly07424 445105

At the bottom of the published London range, yes, if the layout stays exactly where it is, the suite is a straightforward replacement and the tiling is modest. The like-for-like row runs £5,000–£8,000, and one guide's basic figure starts below that. What £5,000 does not cover is moving the WC, a wet room floor, or anything found behind the old tiles, so keep a contingency alongside it rather than inside it.

Want a figure for your bathroom, not a market range?

Send the room size, a couple of photographs and whether anything is moving. We will come back with an honest bracket and what would move it, before anyone visits.

Call usGet a quote