Shop front installation in London: glazing, doors, fascias and shutters

The front is the part of a shop the street judges first and the borough controls most. We fit it to your designer's drawings, open the structure safely, and get the consents lined up before the old front comes out.

  • Fixed-price contract
  • Principal contractor, CDM 2015
  • In-house crew
Pop Mart store fit-out in Oxford (photo 18)

Updated November 2026

Shop front installation replaces the glazing, entrance door, fascia sign and shutter across a shop's street opening, usually as part of a fit-out. In London a new front that changes how the building looks normally needs planning permission, and an illuminated sign often needs advertisement consent. MO Team installs shop fronts to your designer's drawings under one fixed-price contract.

Shop front fitters in London, working as part of the fit-out

A shop front is everything between the pavement and the shop floor: the stallriser at the base, the pilasters either side, the glazing and its frames, the entrance door, the fascia board that carries the name, and often a shutter box hidden above it. Most London fronts are one of three kinds. A framed aluminium front is slim, secure and quick to make. A frameless front is toughened or laminated glass held in channels with minimal metal, which suits a café or a showroom that wants the whole interior on show. A timber front, painted and moulded, is what most conservation areas and listed parades expect, because it matches the Victorian and Edwardian shop fronts the street was built with. Your shop front design decides which one you get; our job is to build it so that it fits the opening, keeps the weather out and locks at night.

On a London high street the front is rarely just a glazing job. Many parades have flats above, and the original timber or cast-iron beam over the opening is carrying them, so widening the opening or moving the door means a structural engineer's calculations, temporary props and a new steel or lintel before any glass arrives. Where that beam bears on a wall shared with the next shop, the Party Wall Act applies. Planning sits alongside: a new front that changes the building's appearance normally needs permission, conservation areas and listed buildings bring stricter tests, some streets carry Article 4 directions, and illuminated signs are governed by the advertisement regulations. If the unit is leased, the landlord's licence to alter comes first. Then the practical London part: a footway licence for any hoarding or scaffold, loading restrictions on red routes, and an opening that has to be secured the same shift the old front comes out.

We install shop fronts and signage as part of our fit-outs rather than as a standalone glazing trade. On the Pop Mart store in Oxford and the Herono unit on Brick Lane, the front and fascia were part of the fit-out works. Frames and glass are made to measure by a specialist fabricator from our survey; our own team does the main trades around them: the opening, the steelwork, the stallriser, the fascia board and the making good. Sign wiring and shutter motors are connected and certified by the relevant specialist. If the front is part of a larger job, our retail fit-out and café fit-out pages cover the interior, and what a fit-out contractor does explains how one contract holds it all together.

What a new shop front includes

One contract for the whole front, priced against your designer's drawings and a written specification.

  • Measured survey of the opening

    The opening, the levels at the threshold, the condition of the beam and stallriser, and what is hidden behind the old fascia, checked against your shop front design before anything is ordered.

  • Structural opening, beam and lintel

    Temporary propping, a new steel or lintel and padstones to a structural engineer's calculations where the opening is widened or the old beam has failed, inspected by building control.

  • Frameless and framed glazing

    Toughened or laminated safety glass in aluminium, steel or timber frames, or frameless panels in floor and head channels, with manifestation on large panes.

  • Entrance doors

    Single or double doors, manual or automatic, with an accessible threshold and a clear opening width that meets Part M, and ironmongery that works as a fire exit.

  • Fascia and signage

    The fascia board, built-up letters, a lightbox or a hanging sign, fixed to the front and wired by the relevant specialist where it is illuminated.

  • Roller shutter installation and grilles

    Internal shutters or lattice grilles behind the glass, or an external shutter where consent allows, manual or electric, with the box concealed behind the fascia where the front permits.

  • Consents and approvals

    Planning permission, advertisement consent and listed building consent where needed, the landlord's approval of the drawings, and the footway licence for the hoarding.

  • Securing the shop and handover

    The opening boarded or hoarded whenever it is not glazed, the pavement made good, keys and shutter controls handed over with the certificates.

What our shopfront installation covers

We handle

  • Measured survey and a check of the drawings against the opening
  • Structural engineer engaged for the beam, and building control
  • Planning and advertisement consent applications, from your designer's drawings
  • Party wall notices where a new beam bears on a shared wall
  • Hoarding, the footway licence application and site security
  • Removal and disposal of the old front and shutter
  • Installing frames, glazing, doors, fascia, signage and shutters
  • Making good the pavement edge, reveals and soffit

You provide

  • Your designer's or brand's shop front drawings and sign artwork
  • The landlord's licence to alter where the unit is leased
  • Decisions on glass, frame finish, shutter type and sign lighting when the programme asks
  • Access to the unit and to the rooms above if propping is needed
  • An agreed date for the shop to close, if it has to

Not included

  • Planning, advertisement consent and building control fees paid to the borough
  • Footway licence and parking bay charges levied by the borough
  • Party wall surveyor fees
  • Design of the shop front and the sign artwork
  • The interior fit-out, unless it is part of the same contract
  • Alarm, CCTV and access control beyond the shutter

How it runs

  1. 01

    Survey the front and what holds it up

    We measure the opening, lift a section of the old fascia to see the beam behind it, check the threshold levels against the pavement and note what the flats above rely on. If the opening cannot take the front as drawn, we say so before the fabricator is asked for a price.

    You receive
    A survey note with dimensions, photos and any structural concerns
  2. 02

    Consents and approvals in parallel

    Planning, advertisement and listed building applications go in on your designer's drawings, the landlord reviews the same set under the licence to alter, and a structural engineer designs any new beam. Nothing is fabricated until the consents and the landlord's approval are in writing.

    You receive
    Submitted applications, the engineer's calculations and the landlord's approval
  3. 03

    Fabrication drawings and preparing the street

    The specialist fabricator produces shop drawings from our survey, which go back to your designer for sign-off. Meanwhile we book the footway licence, plan the hoarding and agree loading times with the borough so the delivery day is not lost to a parking warden.

    You receive
    Approved fabrication drawings and the street permits
  4. 04

    Out with the old, opening made safe

    The hoarding goes up, the old front and shutter come out, props go in where needed and the new beam is fitted and inspected. The opening is boarded and locked at the end of every shift, so the shop is never left open to the street.

    You receive
    A propped, inspected and secured opening ready for the frames
  5. 05

    Install, light up and hand over

    Frames, glazing and doors are fixed, the stallriser and fascia finished, the sign and shutter fitted and connected by the relevant specialist, and the pavement made good. We snag it with you in daylight and again after dark, then hand over keys and certificates together.

    You receive
    A finished front, shutter controls, keys and the certificates

Planning, advertisement consent and building regulations for a shop front

  • Advertisement consent for fascia and projecting signs

    Signs on shop premises are controlled by the Town and Country Planning (Control of Advertisements) (England) Regulations 2007. A non-illuminated sign within the Regulations' limits, such as its top below 4.6 metres or the first-floor window sill and lettering no taller than 0.75 metres, generally has deemed consent. Illumination is restricted further, and in a conservation area an illuminated sign generally needs express consent from the borough (checked October 2026; confirm with your borough before ordering).

    Control of Advertisements Regulations 2007 ↗
  • Conservation areas and listed buildings

    A new shop front that materially changes a building's appearance normally needs planning permission anywhere. In a conservation area the borough must consider whether it preserves or enhances the area's character, which is why timber fronts and internal shutters are often expected. On a listed building, listed building consent is needed for any alteration affecting its character, and carrying out work without it is an offence under the 1990 Act.

    Planning (Listed Buildings and Conservation Areas) Act 1990 ↗
  • Approved Document K: safety glass and manifestation

    Glazing in critical locations, in and beside doors and low in walls, must break safely or resist impact, which on a shop front means toughened or laminated glass. Large panes that people could walk into need manifestation, marks or a band, in zones roughly 850 to 1,000 millimetres and 1,400 to 1,600 millimetres above the floor.

    Approved Document K ↗
  • Approved Document M: getting through the door

    The entrance to a shop is the public's way in, so Approved Document M volume 2 applies: a level or near-level threshold, a door that is not too heavy to open, and an effective clear width of 1,000 millimetres for an external door used by the general public. On a sloping London pavement the threshold is often the hardest part of the front to get right.

    Approved Document M ↗
  • Party Wall etc. Act 1996

    Where a new beam over the opening bears into a wall shared with the neighbouring shop, that is work to a party structure and needs a notice two months before it starts. In a terraced parade that is common, so we serve notices while the consents are being decided rather than after.

    Party Wall etc. Act 1996 ↗

Common questions

Straight answers.

Not answered here?

Tell us what you are planning. We read every enquiry ourselves.

Ask us directly07424 445105

It depends mostly on the width of the opening, the glazing system, the door and the shutter, then on what the structure needs and whether the sign is lit. A framed aluminium front over a sound opening costs far less than a frameless or timber front that needs a new beam, propping and party wall notices. We do not publish a guide figure we cannot source; we price your front against the drawings and give a written fixed-price quote.