A Velux, or rooflight, loft conversion keeps the existing roof shape and adds rooflights, a new floor, a staircase, insulation and fire protection. It is the least expensive type, needs the most head height, and rarely needs planning permission. Published London guides put it at £30,000–£55,000. MO Team builds Velux conversions as part of its loft work across London.

The conversion that leaves the roof alone

Velux is a brand of rooflight that has become the name for the whole type: a conversion where nothing is added to the outside of the house except windows set into the slope. Inside, the work is the same as any other loft. A new structural floor goes in over the old ceiling joists, usually on steels bearing on the party walls, so the bedroom below does not carry the new room. The rafters are trimmed to take the rooflights, insulation goes between and under them to current standards, a stair rises from the landing below, and the stairwell is fire-protected because the house has gained a storey. What you do not pay for is a dormer or mansard structure, the roofing and cladding that go with it, or, in most cases, a planning application. That is why the published London range starts around £30,000 rather than £55,000.

The catch is head height, and it is a hard one. A dormer creates height where there was none; a rooflight conversion has to find it in the existing roof. About 2.2 metres from the top of the ceiling joists to the underside of the ridge is the working minimum for any loft, and a Velux conversion needs comfortably more than that, because the slope stays on both sides and the standing area is only the strip under the ridge. The steep Victorian and Edwardian roofs across London often have it; shallower 1930s roofs and trussed roofs usually do not, and there a dormer or a hip-to-gable is the honest recommendation even though it costs more. The other limit is floor area you can use: furniture fits under the slope, people do not, so a Velux room is a good bedroom, study or guest room and rarely a second bedroom with a bathroom. Rooflights that project no more than 150 millimetres from the roof plane are permitted development on a house, even at the front; conservation areas and Article 4 directions can still restrict them, and our extension planning guide explains how to check your street for one.

MO Team designs and builds loft conversions across London, and a rooflight conversion is the one we would be most likely to talk you out of, because the tape measure decides it. On the first visit we measure the ridge, look at the rafters and purlins and find where the stair can land; if the height is marginal we say so, and if a dormer would give you a usable room for the extra cost we say that too. Where it does work, it is the quickest and least disruptive loft: no scaffold beyond what the rooflights need, no roof open to the weather, and the stairwell opened last. Our rear dormer loft conversion shows the standard of the floor, the stair and the finish we work to. Loft conversions in London compares all four types, and the loft conversion cost guide sets out typical London prices from published sources.

What a Velux loft conversion includes

One package from the head-height check to the completion certificate, priced against a written specification.

  • Head-height and structure check

    The clear height at the ridge, the rafter and purlin layout, whether the roof is cut or trussed, and where the stair can land on the floor below.

  • Floor and rooflight design

    A new structural floor on steels, rooflight positions and sizes chosen for light, escape and the view, all calculated by a structural engineer.

  • Building control and party wall

    The building control application, and party structure notices where the floor steels bear on a party wall, served early so the period runs during design.

  • Rooflights fitted

    Rafters trimmed and rooflights installed with flashings to the tiles or slates, without opening the roof beyond the window itself.

  • Insulation between and under the rafters

    A ventilated or warm-roof build-up to current standards, so the room stays cool in summer and free of condensation in winter.

  • Stair and fire protection

    A new stair with compliant headroom, fire doors to the rooms off the stairwell, a protected enclosure and interlinked alarms on every floor.

  • Electrics, heating and plastering

    Lighting, sockets, a radiator or underfloor heating, plasterboard and skim to the slopes and the ceiling, and the landing made good.

  • Certificates and handover

    Building control inspections through to the completion certificate, with electrical certificates and rooflight warranties handed over together.

What is in the price

We handle

  • Head-height survey and structural design
  • Building control application and inspections
  • Party wall notices where the steels need them
  • Rooflights supplied and fitted with flashings
  • Structural floor, insulation and plasterboard
  • Stair, fire doors and alarm work on the floors below
  • Electrics, heating and decoration to the new room
  • The completion certificate and the handover pack

You provide

  • The loft cleared before we start
  • Decisions on rooflight sizes, blinds and finishes when the programme asks
  • Freeholder consent where the house is leasehold
  • Somewhere dry to store materials
  • Your neighbours' details if party wall notices are needed

Not included

  • Building control and any certificate fees, paid to the authority
  • Party wall surveyor fees, where a neighbour appoints one
  • A dormer or any change to the roof shape, which is a different job
  • An en-suite, unless the drainage allows it and it is specified
  • Redecoration of rooms disturbed only by new fire doors
  • Fitted wardrobes under the slopes, unless specified

How it runs

  1. 01

    Measure the height and tell you the truth

    We measure from the top of the ceiling joists to the underside of the ridge, check whether the roof is cut or trussed, and work out where the stair lands. If a rooflight conversion would leave you crouching, we say so and explain what a dormer would add.

    You receive
    A viability note with the measured height and the honest recommendation
  2. 02

    Design the floor, the rooflights and the stair

    The engineer designs the new floor on steels, the rooflight trimming and any purlin changes. Rooflight positions are set for daylight, for an escape-sized opening and for what you will see from the bed rather than for symmetry on the roof.

    You receive
    Building control drawings and structural calculations
  3. 03

    Building control and notices

    The building control submission goes in, and party structure notices are served where the steels bear on a party wall. There is usually no planning application, and where a certificate is worth having for a later sale we apply for one.

    You receive
    A submitted application, served notices and a start date
  4. 04

    Floor, rooflights and insulation

    Steels and joists go in over the old ceiling, the rafters are trimmed and the rooflights fitted and flashed in a day or two each, then the insulation, ventilation and boarding to the slopes and ceiling. The roof is never open, so the weather rarely stops the job.

    You receive
    A boarded, insulated room with inspection records
  5. 05

    Stair, services and sign-off

    The stair opening is cut last, the flight fitted, fire doors and alarms installed, electrics and heating completed, plastering and decoration done. Building control signs off and the certificates are handed over as one pack.

    You receive
    Completion certificate, electrical certificates and rooflight warranties

Regulations that apply to a rooflight conversion

  • Permitted development for rooflights

    Rooflights on a house are permitted development where they project no more than 150 millimetres from the roof plane and do not rise above the ridge; side-facing ones must be obscure-glazed and, below 1.7 metres from the floor, non-opening. Conservation areas and Article 4 directions can restrict them on the front slope, and flats have no permitted development at all.

    Planning Portal: loft conversions ↗
  • Approved Document L: insulation

    Converting a loft to a room means the roof slopes become the thermal envelope and have to be insulated to current standards, between and under the rafters, with either a ventilated void above the insulation or a warm-roof build-up. Done badly it condenses; done to the standard it is a comfortable room in both seasons.

    Approved Document L ↗
  • Approved Document K: the stair

    In a rooflight conversion the stair is where head height is most often lost, because the slope stays on both sides and the flight has to arrive under the ridge. Approved Document K asks for two metres of headroom over the flight, reduced to 1.9 metres at the centre and 1.8 at the edge under a sloping ceiling, a pitch no steeper than 42 degrees and a landing at the top, so we design the stair before the rooflights are placed and check the headroom against the measured ridge, not the drawing.

    Approved Document K ↗
  • Approved Document B: fire safety

    A rooflight conversion adds a storey like any other, so the stair becomes a protected route with fire doors, 30 minutes of fire resistance to the enclosure and interlinked alarms on every level. An escape-sized rooflight is required in the room as well, but on its own it does not replace the protected stair above the first floor.

    Approved Document B ↗
  • Building control sign-off

    On a rooflight conversion the inspections fall at the steels and the new floor, the rafter trimming for the rooflights, the insulation and ventilation build-up before it is boarded, and the stair and fire doors, through the borough's building control team or a registered building control approver. Without the completion certificate the room is a boarded loft, however good it looks, and a buyer's surveyor will describe it as one.

    LABC ↗

Work of this kind

Common questions

Straight answers.

Not answered here?

Tell us what you are planning. We read every enquiry ourselves and reply within one working day.

Ask us directly07424 445105

Published London guides for 2026 put a Velux or rooflight conversion at £30,000–£55,000. That is the median of several companies' ranges, not our quote; the sources disagree on what a basic conversion includes, and some quote with VAT while others do not. Building control fees, any party wall surveyor and the decoration below come on top. Our loft conversion cost guide lists the sources, and the same page shows why a dormer starts at £55,000.

Is your roof tall enough for a Velux conversion?

Measure from the top of the ceiling joists to the underside of the ridge and send it with a photo of the loft. We will tell you straight away whether a rooflight conversion works or whether a dormer is the better use of the money.