Skip to content
MO TeamConstruction

Residential · Loft conversions

Dormer loft conversions in London: rear, L-shaped and full-width

The London loft. A box built out of the rear roof slope gives full head height where there was a triangle, usually without a planning application. We measure the ridge and find the stair on the first visit and tell you whether your roof will take it.

  • Design and build

Updated September 2026

A dormer loft conversion builds a box-shaped extension out of the rear roof slope, giving full head height and a flat ceiling across most of the loft. It suits most London terraces and semis, usually falls within permitted development, and published London guides put a rear dormer at £55,000–£80,000. MO Team designs and builds dormer conversions across London.

Why the dormer is the London loft

On a Victorian or Edwardian terrace the only roof slope that can grow without breaking the front roof plane is the one at the back, so a flat-roofed box is built out of it, running most of the width of the house and giving a level ceiling where there was a slope. The result is a bedroom with standing height across most of its floor, a window wall at the back, and usually room for a shower room under the ridge. Where the house has a back addition, an L-shaped dormer picks that up as well and produces a second room or a larger bathroom. Smaller pitched or gable-fronted dormers are used where a full-width box would not get consent, usually at the front or in a conservation area, and they add light more than floor.

Two measurements decide whether a dormer is worth doing before anyone talks about layout. The first is head height: about 2.2 metres from the top of the ceiling joists to the underside of the ridge is the usual working minimum, because the new floor, the insulation and the plasterboard take roughly 300 millimetres out of it. The second is where the stair can land. The cheapest stair continues the existing flight in the same direction and arrives under the ridge; a stair that has to turn or land under the slope eats into the room and often into a bedroom below. Rear dormers on a house normally sit within permitted development, with a volume allowance of 40 cubic metres on a terrace and 50 on a semi or detached house, provided the box sits back at least 20 centimetres from the eaves, stays below the ridge and is finished in materials that look similar to the roof. Conservation areas and Article 4 directions remove that right, and flats never had it. Our extension planning guide explains how to check your street for an Article 4 direction.

MO Team designs and builds loft conversions across London, and a rear dormer is the type we have built: the loft conversion with dormer in our project record shows the structure, the stair and the finish. The sequence on a dormer is set by the weather and the neighbours. Steels usually bear on to the party walls on both sides, which means notices to both neighbours on a terrace and a two-month period before work can start, so we serve them at design stage. Scaffold goes up, the rear slope is opened and the dormer is framed and made weathertight in one push rather than left open between trades, and the ceiling below is not broken through until the roof is closed. If you are not sure which type your roof will take, loft conversions in London compares dormer, hip-to-gable, mansard and Velux, and the loft conversion cost guide sets out typical London prices for each from published sources.

What a dormer loft conversion includes

Priced as one package against a written specification, from the roof survey to the completion certificate.

  • Roof survey and dormer sizing

    Ridge height, rafter and purlin layout, where the stair can land, and how much of the rear slope the dormer can take within the volume allowance.

  • Structural design

    New floor joists on steels spanning party wall to party wall, the dormer frame, the flat roof and the trimming around the stair opening, all calculated by a structural engineer.

  • Permitted development check and building control

    A lawful development certificate where the dormer qualifies, a planning application where it does not, and the building control application either way.

  • Party wall notices

    Party structure notices to the neighbours on both sides where the steels bear on the party walls, served early so the two-month period runs during design.

  • Dormer construction and weatherproofing

    Rear slope opened, dormer framed, flat roof laid, cheeks and face clad in tile-hanging, slate, render or a standing-seam finish to suit the planning position, windows fitted.

  • Staircase and fire protection

    New stair with compliant headroom, fire doors to the rooms off the stairwell, a 30-minute enclosure and interlinked alarms on every floor.

  • Insulation, services and en-suite

    Warm roof and wall insulation to Part L, electrics, heating, and the plumbing and drainage for a shower room where the soil stack can reach.

  • Plastering, decoration and handover

    Finishes throughout the new floor and the landing below, then the completion certificate and electrical certificates handed over as one pack.

What is in the price

We handle

  • Roof survey, dormer design and structural calculations
  • Lawful development certificate or planning application, and building control
  • Party wall notices prepared and served
  • Scaffold, the footway licence application and site protection
  • Dormer structure, roofing, cladding and windows
  • Stair, fire doors and alarm work on the floors below
  • Insulation, electrics, plumbing and plastering
  • Building control inspections through to the completion certificate

You provide

  • The loft cleared, and the rooms below the stair opening emptied when asked
  • Decisions on windows, cladding, sanitaryware and finishes when the programme asks
  • Freeholder consent where the house is leasehold
  • Access for the scaffold and somewhere dry to store materials
  • Your neighbours' details for the party wall notices

Not included

  • Planning, certificate and building control fees, paid to the authority
  • Party wall surveyor fees, including a neighbour's own surveyor
  • Footway licence and parking bay charges levied by the borough
  • Sanitaryware and tiles beyond the agreed specification
  • Redecoration of rooms disturbed only by new fire doors
  • Fitted wardrobes and loose furniture

How it runs

  1. 01

    Measure the ridge and find the stair

    We measure the clear height under the ridge, look at how the rafters and purlins are arranged, and work out where a stair can rise from the landing below without taking a bedroom. If the numbers do not work we say so on the first visit rather than after a drawing.

    You receive
    A written viability note with the head height and the stair position
  2. 02

    Size the dormer against the rules

    The dormer is drawn to the roof, not the other way round: how much of the rear slope it can occupy within 40 or 50 cubic metres, the 20-centimetre set-back from the eaves, the window positions and what the cheeks will be clad in. A structural engineer designs the floor, the steels and the frame.

    You receive
    Application drawings with structural calculations
  3. 03

    Certificate, building control and party wall notices

    A lawful development certificate application where the dormer is permitted development, a planning application where it is not, the building control submission, and party structure notices to both neighbours so the two-month period runs while the drawings are approved.

    You receive
    Submitted applications and served notices, with a start date that respects them
  4. 04

    Open the roof and close it fast

    Scaffold up, steels carried in, the new floor laid over the old ceiling, then the rear slope cut and the dormer framed, decked and made watertight in as few days as the weather allows. The house stays lived in below; the ceiling is not broken through until the roof is closed.

    You receive
    A weathertight dormer shell and the inspection records
  5. 05

    Stair, fit-out and certificates

    The stair opening is cut last, the flight fitted, fire doors hung, alarms linked, insulation and services completed, then plastering, decoration and the en-suite. Building control signs off and the certificates are handed over together, not chased afterwards.

    You receive
    Completion certificate, electrical certificates and manufacturer warranties

Regulations that apply to a dormer

  • Permitted development for roof extensions

    A rear dormer on a house is permitted development within 40 cubic metres on a terrace and 50 on a semi or detached house, provided it is set back at least 20 cm from the original eaves, does not rise above the existing ridge, uses materials similar in appearance to the roof and has no balcony. Dormers on the principal elevation where it fronts a highway, flats, conservation areas and Article 4 streets are outside it (Planning Portal, loft conversions, checked September 2026; confirm with your borough or apply for a lawful development certificate).

    Planning Portal: loft conversions ↗
  • Approved Document B: fire safety

    Because a dormer conversion makes a two-storey house three storeys, the escape route is the stair, not the dormer window. That means fire doors to the habitable rooms opening on to the stairwell on every floor, 30 minutes of fire resistance to the enclosure, mains-powered interlinked alarms on each level and, where the ground floor is open plan, either the stair enclosed down to a final exit or a sprinkler-based alternative agreed with building control. A large opening window in the dormer is still required, but it is not the escape.

    Approved Document B ↗
  • Approved Document K: the stair

    Two metres of headroom over the flight, reduced to 1.9 metres at the centre and 1.8 at the edge under a sloping ceiling, a maximum pitch of 42 degrees and a landing at the top. A space-saver stair is allowed only where it serves a single room, which limits what the loft can be called later.

    Approved Document K ↗
  • Party Wall etc. Act 1996

    Steels bearing into a party wall are work to a party structure and need a notice two months before starting. On a terrace that means both neighbours. A neighbour who does not consent in writing within 14 days is in dispute under the Act, and a surveyor's award follows before work can begin.

    Party Wall etc. Act 1996 ↗
  • Building control sign-off

    On a dormer the inspections fall at the steels and the new floor, the dormer frame before it is clad, the insulation before it is boarded, the stair and the fire doors, and the drainage for an en-suite. They go through the borough's building control team or a registered building control approver, and the completion certificate at the end is what a buyer's solicitor asks for; a dormer without one is a boarded loft on paper.

    LABC ↗

Work of this kind

Common questions

Straight answers.

Not answered here?

Tell us what you are planning. We read every enquiry ourselves and reply within one working day.

Ask us directly07424 445105

Published London guides for 2026 put a rear dormer at £55,000–£80,000, a dormer with an en-suite at £60,000–£92,000 and an L-shaped dormer at £70,000–£105,000. Those are market ranges compiled from several companies' cost guides, not our quotes, and some include VAT while others do not. Planning or certificate fees, building control, party wall surveyors and sanitaryware come on top. Our loft conversion cost guide lists the sources and the fees.

Not sure a dormer will fit your roof?

Send a photo of the loft, the height at the ridge and a photo of the back of the house. We will tell you honestly whether a dormer works and roughly what it involves before anyone visits.

Call usGet a quote