A kitchen renovation in Islington typically runs ten to fourteen weeks on site because most projects here involve a structural opening between the kitchen and the rear reception room, which needs an engineers calculation and building control sign-off before work starts.
Working here
Islington is almost entirely Victorian and Georgian terraced housing, and the kitchens we replace here were usually added to the back of the house long after it was built. The rear returns are narrow, the party walls are shared on both sides, and the ground floors have often been altered at least once already. That combination shapes every project we take on in the borough: there is rarely a simple like-for-like replacement, because the layout that exists is almost never the layout anyone would choose today. Most of our work here involves opening the kitchen into the rear reception room, which means a structural opening, a steel, and building control sign-off before anything else can proceed.
The party wall position is what most people underestimate here. An Islington terrace is attached on both sides, so a structural opening at the rear usually means notice to two neighbours rather than one, and each has the same statutory period to respond. Two months for work to a party wall, one month for excavation. Served at the right time those run alongside the design work and cost nothing; served late they are simply added to the end of the programme, which is why we raise them at the first visit rather than the week before we mobilise.
The other Islington-specific issue is what the ground floor has already been through. Many of these houses were converted to flats and back again, or had a previous opening formed without calculations, and it is common to find a beam that was never sized properly holding up the floor above. We open up and check before pricing the steel rather than after, because discovering it mid-build turns a scheduled week into an unscheduled month.
Getting the work done here
Work near here
- Photography to follow
Common questions
Straight answers.
Not answered here?
Tell us what you are planning. We read every enquiry ourselves and reply within one working day.
Ask us directlyMost Islington kitchen projects open the kitchen into the rear reception room, which means removing or altering a structural wall. That needs an engineer's calculation for the new opening and a building control application, submitted through Islington Council or an approved inspector, before the wall comes out. A like-for-like refit with no structural change does not carry the same requirement.
Often, because Islington terraces are attached on both sides and a structural opening at the rear can affect the shared walls. Notice periods are set by the Party Wall etc. Act 1996: two months for work to a party wall, one month for excavation near a neighbouring structure. We raise this at the first visit so notices go out early rather than delaying the start.
It can. Many Islington terraces were converted to flats and back again, or had an earlier opening formed without proper calculations, and it is not unusual to find a beam that was never sized correctly. We open up and check the existing structure before pricing the steel, so any earlier work is accounted for rather than discovered once the kitchen is under way.