Residential
Interior redesign and reconfiguration for London homes
The programme is set by what you order, not by what we build. Joinery and specialist finishes have lead times, so procurement is planned before a start date is agreed.
- Fixed-price contract
- In-house crew
Updated October 2026
Interior redesign in London reworks how an existing home is laid out and finished: moving or removing partitions, opening rooms up, adding made-to-measure joinery, redesigning lighting, and replacing floors and finishes. MO Team prices the agreed reconfiguration against a schedule of finishes and builds it with its own team.
Redesign, not redecoration
This is for a home that works badly rather than one that is worn out. A flat with a corridor that eats a third of the floor area, a house where the only bathroom is off the kitchen, a living room that cannot take a sofa because of where the doors are. The work is reconfiguration: partitions moved, an open-plan run formed between two rooms, storage built into the awkward geometry, and a lighting design that stops treating a single pendant as a room's answer. Structure sometimes changes, and often it does not.
We work from a measured survey and the agreed drawing set, with elevations, a joinery schedule and a finishes schedule, and only then to a fixed price. Procurement drives the programme on this kind of job more than construction does. Made-to-measure joinery, stone, specialist plaster and imported tile all carry lead times, and a start date set before those are placed is a date that will move. In London the constraints are usually the building rather than the design: a flat brings a lease, a freeholder, a licence to alter, acoustic requirements on floor build-ups, and building management rules on hours, lifts and waste. In a conservation area or under an Article 4 direction, changing windows or the front door is controlled even when the rest of the work is entirely internal. Old buildings compound that. Nothing in a Victorian flat is square, walls are rarely plumb and floors are rarely level, so joinery drawn to a nominal dimension does not fit the room it was drawn for. We survey again before anything is manufactured, and scribe on site rather than filling the gap with a bead of caulk.
One team building it removes the usual gap. The carpenter measuring for a run of joinery is working to the same drawing as the person who set out the room, so a shadow gap that cannot be achieved gets resolved on paper. It also means one programme: the plasterer is not standing down because a delivery that nobody was tracking has slipped.
What an interior redesign includes
Procurement and build under one contract, priced against a written schedule.
What is in the price
How it runs
- 01
Survey and layout options
We measure the property, find the structural lines and the service routes, and give a plain view on what each layout you are considering costs relative to the others.
- You receive
- A survey and a cost view on each layout
- 02
Drawings and schedules agreed
The chosen layout agreed with elevations and sections, a joinery schedule, a lighting layout and a finishes schedule naming every material, with your designer where you have one. This is the last stage where changes are free.
- You receive
- An agreed drawing set, joinery schedule and finishes schedule
- 03
Fixed price and procurement plan
A fixed price against the schedules, and a procurement plan showing what has to be ordered by when. Long-lead items are placed before a start date is agreed rather than after.
- You receive
- A fixed-price contract and a dated procurement schedule
- 04
Build and install
Protection, strip-out, partitions, first fix, plaster and floors, then joinery installation and second fix. Joinery is fitted to the room as built, having been measured against it.
- You receive
- Weekly progress updates against the programme
- 05
Decoration, snagging and handover
Decoration, lighting commissioned and set, a joint snagging walk, and the certificates handed over as a set.
- You receive
- Electrical certificate, warranties and a closed-out snagging list
What applies to internal work
Common questions
Straight answers.
Not answered here?
Tell us what you are planning. We read every enquiry ourselves.
Ask us directly07424 445105It depends on how settled your layout is. We build from your architect's or designer's drawings and price against them, and a structural engineer is engaged where a wall or floor is affected. What matters is that one party is responsible for whether the drawing can actually be built at the price agreed.
Usually, within three limits. The lease governs what you may alter and normally requires the freeholder's written consent. Structure limits which walls can move, and in a block many internal walls are also compartment walls between flats. Drainage limits where a kitchen or bathroom can go, because waste runs need fall to reach the existing stack. We check all three at the survey.
Almost always for anything beyond decoration. Most London leases require consent for altering partitions, changing floor finishes, moving wet areas, or touching services. Consent often takes the form of a licence to alter, with the freeholder's surveyor reviewing the drawings and a fee payable. It takes weeks rather than days, so we build it into the programme rather than discovering it at mobilisation.
It depends on whether it is a single room, a room with made-to-measure joinery or a whole flat, so we give you a programme with the quote. Joinery manufacture and a licence to alter both come before the work on site.
A survey, partition alterations, joinery designed to the surveyed dimensions, a lighting and electrical redesign, floor build-ups and finishes, plastering, tiling and decoration. It excludes loose furniture, curtains and styling. Where a new layout crosses a loadbearing line, the structural calculations, the steel and the building control application are added as a defined package.
Earlier than most people expect. The procurement schedule gives each item an order-by date, working back from the week it is needed on site. Joinery, stone, specialist plaster and imported tile are the long poles. A decision that slips by a week rarely costs a week; it costs whatever the next available slot in the manufacturer's programme is.
Often yes, for reasons other than structure. New electrical circuits are notifiable, altering a flat's escape route or compartmentation is controlled, replacing a window engages thermal and safety requirements, and floor build-ups in flats engage the sound insulation requirements. We tell you which apply before pricing, so the fee and the inspection sit in the programme rather than appearing later.
For a single room, usually. For a whole-flat reconfiguration, rarely worth it: the services go off, the floors come up, and the dust reaches everywhere regardless of protection. Where staying is the only option we phase it room by room and keep a kitchen and a bathroom working, accepting that this adds weeks to the programme rather than pretending it does not.
Room not working?
Send the floor plan and a note on what is wrong with how you use it. We will come back with options before anyone visits.