Skip to content
MO TeamConstruction

Residential

Interior redesign and reconfiguration for London homes

The programme is set by what you order, not by what we build. Joinery and specialist finishes have lead times, so procurement is planned before a start date is agreed.

  • Fixed-price contract
  • In-house crew

Updated October 2026

Interior redesign in London reworks how an existing home is laid out and finished: moving or removing partitions, opening rooms up, adding made-to-measure joinery, redesigning lighting, and replacing floors and finishes. MO Team prices the agreed reconfiguration against a schedule of finishes and builds it with its own team.

Redesign, not redecoration

This is for a home that works badly rather than one that is worn out. A flat with a corridor that eats a third of the floor area, a house where the only bathroom is off the kitchen, a living room that cannot take a sofa because of where the doors are. The work is reconfiguration: partitions moved, an open-plan run formed between two rooms, storage built into the awkward geometry, and a lighting design that stops treating a single pendant as a room's answer. Structure sometimes changes, and often it does not.

We work from a measured survey and the agreed drawing set, with elevations, a joinery schedule and a finishes schedule, and only then to a fixed price. Procurement drives the programme on this kind of job more than construction does. Made-to-measure joinery, stone, specialist plaster and imported tile all carry lead times, and a start date set before those are placed is a date that will move. In London the constraints are usually the building rather than the design: a flat brings a lease, a freeholder, a licence to alter, acoustic requirements on floor build-ups, and building management rules on hours, lifts and waste. In a conservation area or under an Article 4 direction, changing windows or the front door is controlled even when the rest of the work is entirely internal. Old buildings compound that. Nothing in a Victorian flat is square, walls are rarely plumb and floors are rarely level, so joinery drawn to a nominal dimension does not fit the room it was drawn for. We survey again before anything is manufactured, and scribe on site rather than filling the gap with a bead of caulk.

One team building it removes the usual gap. The carpenter measuring for a run of joinery is working to the same drawing as the person who set out the room, so a shadow gap that cannot be achieved gets resolved on paper. It also means one programme: the plasterer is not standing down because a delivery that nobody was tracking has slipped.

What an interior redesign includes

Procurement and build under one contract, priced against a written schedule.

  • Survey and layout options

    Measured survey, two or three reconfiguration options, and an honest view on which the building will allow.

  • Pricing to the drawings and joinery schedule

    The agreed plans, elevations, sections and joinery schedule, checked against the survey so they can be manufactured and priced.

  • Non-structural reconfiguration

    Partitions removed and formed, doorways moved, ceilings altered, and openings lined and made good.

  • Structural openings where needed

    Calculations, steels and building control where a reconfiguration crosses a loadbearing line.

  • Made-to-measure joinery

    Wardrobes, alcove units, media walls, panelling and shelving, made to the surveyed dimensions rather than to a catalogue.

  • Lighting and electrical redesign

    Circuit layout, switching, dimming, feature and task lighting, and the certification for notifiable work.

  • Floors, walls and specialist finishes

    Floor build-ups with acoustic layers where a lease requires them, plaster finishes, tiling and decoration.

  • Procurement and programme management

    Lead times tracked against the programme, deliveries received and checked, and one site manager holding the sequence.

What is in the price

We handle

  • Measured survey, and pricing against the agreed drawings
  • Joinery and finishes schedules
  • Structural calculations and building control where the work needs them
  • Partition works, openings, linings and making good
  • Joinery manufacture and installation
  • Electrical, lighting and any plumbing alterations
  • Flooring, plastering, tiling and decoration
  • Procurement tracking, deliveries and programme management
  • A second survey before joinery is released to manufacture

You provide

  • Selections and sign-off by the dates the procurement programme sets
  • Freeholder consent or a licence to alter where the lease requires it
  • Access, and agreement with the building manager on hours and lift use
  • Furniture and belongings moved or stored before the start date
  • Any existing floor plans, lease plans or previous drawings you hold

Not included

  • Loose furniture, curtains, blinds, rugs and styling
  • Artwork, mirrors and accessories not named in the schedule
  • Freeholder or managing agent consent fees
  • Items you procure directly, for product defects and delivery delays
  • Structural work beyond what the agreed layout requires

How it runs

  1. 01

    Survey and layout options

    We measure the property, find the structural lines and the service routes, and give a plain view on what each layout you are considering costs relative to the others.

    You receive
    A survey and a cost view on each layout
  2. 02

    Drawings and schedules agreed

    The chosen layout agreed with elevations and sections, a joinery schedule, a lighting layout and a finishes schedule naming every material, with your designer where you have one. This is the last stage where changes are free.

    You receive
    An agreed drawing set, joinery schedule and finishes schedule
  3. 03

    Fixed price and procurement plan

    A fixed price against the schedules, and a procurement plan showing what has to be ordered by when. Long-lead items are placed before a start date is agreed rather than after.

    You receive
    A fixed-price contract and a dated procurement schedule
  4. 04

    Build and install

    Protection, strip-out, partitions, first fix, plaster and floors, then joinery installation and second fix. Joinery is fitted to the room as built, having been measured against it.

    You receive
    Weekly progress updates against the programme
  5. 05

    Decoration, snagging and handover

    Decoration, lighting commissioned and set, a joint snagging walk, and the certificates handed over as a set.

    You receive
    Electrical certificate, warranties and a closed-out snagging list

What applies to internal work

  • Approved Document P: electrical safety

    A lighting redesign means new circuits, which are notifiable. The installation is tested and certified, and the certificate is issued in your name at handover.

    Approved Document P ↗
  • Approved Document B: fire safety in flats

    Altering a flat's internal layout can affect the escape route and the compartmentation between flats. Doors on to a protected route, and the integrity of separating walls and floors, are controlled even when nothing structural moves.

    Approved Document B ↗
  • Approved Document E: sound insulation

    Replacing a floor finish in a flat usually engages the acoustic requirements as well as the lease. Build-ups are specified with the resilient layer the separating floor needs rather than the thinnest one that fits.

    Approved Documents ↗
  • Conservation areas and Article 4

    Internal reconfiguration rarely needs planning permission, but windows, front doors and external alterations are controlled in a conservation area, and an Article 4 direction can remove permitted development for a whole street.

    Planning Portal ↗
  • Party Wall etc. Act 1996

    A reconfiguration that cuts into a shared wall, even to form a shallow recess or to bear a new opening, is notifiable. In a terrace or a flat that means a two-month party structure notice, which is worth serving while the joinery is still in manufacture rather than the week before mobilisation.

    Party Wall etc. Act 1996 ↗

Common questions

Straight answers.

Not answered here?

Tell us what you are planning. We read every enquiry ourselves.

Ask us directly07424 445105

It depends on how settled your layout is. We build from your architect's or designer's drawings and price against them, and a structural engineer is engaged where a wall or floor is affected. What matters is that one party is responsible for whether the drawing can actually be built at the price agreed.

Room not working?

Send the floor plan and a note on what is wrong with how you use it. We will come back with options before anyone visits.

Call usGet a quote