Residential
Interior redesign and reconfiguration for London homes
The programme is set by what you order, not by what we build. Joinery and specialist finishes have lead times, so procurement is planned before a start date is agreed.
- Fixed-price contract
- In-house crew
- Design and build
Updated September 2026
Interior redesign in London reworks how an existing home is laid out and finished: moving or removing partitions, opening rooms up, adding made-to-measure joinery, redesigning lighting, and replacing floors and finishes. MO Team draws the reconfiguration, prices it against a schedule of finishes, and builds it with its own carpenters and decorators.
Redesign, not redecoration
This is for a home that works badly rather than one that is worn out. A flat with a corridor that eats a third of the floor area, a house where the only bathroom is off the kitchen, a living room that cannot take a sofa because of where the doors are. The work is reconfiguration: partitions moved, an open-plan run formed between two rooms, storage built into the awkward geometry, and a lighting design that stops treating a single pendant as a room's answer. Structure sometimes changes, and often it does not.
We work from a measured survey to a set of layout options, then to a developed drawing set with elevations, a joinery schedule and a finishes schedule, and only then to a fixed price. Procurement drives the programme on this kind of job more than construction does. Made-to-measure joinery, stone, specialist plaster and imported tile all carry lead times, and a start date set before those are placed is a date that will move. In London the constraints are usually the building rather than the design: a flat brings a lease, a freeholder, a licence to alter, acoustic requirements on floor build-ups, and building management rules on hours, lifts and waste. In a conservation area or under an Article 4 direction, changing windows or the front door is controlled even when the rest of the work is entirely internal. Old buildings compound that. Nothing in a Victorian flat is square, walls are rarely plumb and floors are rarely level, so joinery drawn to a nominal dimension does not fit the room it was drawn for. We survey again before anything is manufactured, and scribe on site rather than filling the gap with a bead of caulk.
Doing the design and the build together removes the usual gap. The carpenter measuring for a run of joinery is working to the same drawing as the person who set out the room, so a shadow gap that cannot be achieved gets resolved on paper. It also means one programme: the plasterer is not standing down because a delivery that nobody was tracking has slipped.
What an interior redesign includes
Design, procurement and build under one contract, priced against a written schedule.
What is in the price
How it runs
- 01
Survey and layout options
We measure the property, find the structural lines and the service routes, and produce two or three layout options with a plain view on what each costs relative to the others.
- You receive
- Existing-condition drawings and layout options
- 02
Developed design and schedules
The chosen layout drawn up with elevations and sections, a joinery schedule, a lighting layout and a finishes schedule naming every material. This is the last stage where changes are free.
- You receive
- A drawing set, joinery schedule and finishes schedule
- 03
Fixed price and procurement plan
A fixed price against the schedules, and a procurement plan showing what has to be ordered by when. Long-lead items are placed before a start date is agreed rather than after.
- You receive
- A fixed-price contract and a dated procurement schedule
- 04
Build and install
Protection, strip-out, partitions, first fix, plaster and floors, then joinery installation and second fix. Joinery is fitted to the room as built, having been measured against it.
- You receive
- Weekly progress updates against the programme
- 05
Decoration, snagging and handover
Decoration, lighting commissioned and set, a joint snagging walk, and the certificates handed over as a set.
- You receive
- Electrical certificate, warranties and a closed-out snagging list
How long a reconfiguration takes
On-site duration. Where joinery is involved, the manufacturing lead time runs before the site work and is usually the longer half of the project.
What applies to internal work
Common questions
Straight answers.
Not answered here?
Tell us what you are planning. We read every enquiry ourselves and reply within one working day.
Ask us directlyRoom not working?
Send the floor plan and a note on what is wrong with how you use it. We will come back with options before anyone visits.